Performance evaluation of two-stage multi-product kanban systems

被引:17
|
作者
Krieg, Georg N. [1 ]
Kuhn, Heinrich [1 ]
机构
[1] Catholic Univ Eichstaett Ingolstadt, Fac Business Adm & Econ, D-85049 Ingolstadt, Germany
关键词
kanban system; performance evaluation; Markov chain; queueing system; production/inventory system; stochastic modeling;
D O I
10.1080/07408170701499554
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We propose an approximate evaluation procedure for a kanban-controlled production system with two stages and multiple products. In the. first stage, single-product manufacturing facilities produce items that are the input material for a single multi-product manufacturing facility in the second stage. Each manufacturing facility is controlled by a distinct kanban loop with a. fixed number of kanbans. Processing and setup times are exponentially distributed, demand arrivals at the output store of the second stage are Poisson and independent for each product. If a customer's demand cannot be met from stock, the customer either waits or leaves the system, depending on the admissible number of backorders and the current number of waiting customers (partial backordering). We describe a new decomposition-based approximation method for the evaluation of such systems in steady state. We focus on the performance measures average. fill rate, average fraction of served demand, and average inventory level. We report the results of several numerical tests. The results indicate that the approximation is sufficiently accurate for a large variety of systems. We also illustrate the effects of increasing the maximum number of backorders on the performance of the system.
引用
收藏
页码:265 / 283
页数:19
相关论文
共 50 条
  • [1] Production planning of multi-product kanban systems with significant setup times
    Krieg, GN
    Kuhn, H
    [J]. OPERATIONS RESEARCH PROCEEDINGS 2000, 2001, : 316 - 321
  • [2] Genetic algorithm approach for two-stage multi-product production/distribution system
    Syarif, A
    Wang, XD
    Yamashiro, M
    Gen, M
    [J]. Proceedings of the Second International Conference on Information and Management Sciences, 2002, 2 : 441 - 441
  • [3] CARE: Heuristics for two-stage multi-product inventory routing problems with replenishments
    Nambirajan, Ramkumar
    Mendoza, Abraham
    Pazhani, Subramanian
    Narendran, T. T.
    Ganesh, K.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 97 : 41 - 57
  • [4] Busy Period Analysis of A Two-Stage Multi-Product System with Interstage Buffer
    M. N. Gopalan
    Usha A. Kumar
    [J]. OPSEARCH, 1999, 36 (3) : 284 - 299
  • [5] Optimizing Two-Stage Fuzzy Multi-Product Multi-Period Production Planning Problem
    Feng, Xueqin
    Yuan, Guoqiang
    [J]. INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL, 2011, 14 (06): : 1879 - 1893
  • [6] A decomposition method for multi-product kanban systems with setup times and lost sales
    Krieg, GN
    Kuhn, H
    [J]. IIE TRANSACTIONS, 2002, 34 (07) : 613 - 625
  • [7] Solution Method for Multi-Product Two-Stage Logistics Network with Constraints on Delivery Route
    Ataka, Shinichiro
    Gen, Mitsuo
    [J]. ELECTRONICS AND COMMUNICATIONS IN JAPAN, 2009, 92 (08) : 18 - 24
  • [8] Solution method of multi-product two-stage logistics problem with constraints of delivery course
    Ataka, Shinichiro
    Gen, Mitsuo
    [J]. IEEJ Transactions on Electronics, Information and Systems, 2008, 128 (03) : 456 - 461
  • [9] Adaptive Kanban control systems for two-stage production lines
    Takahashi, Katsuhiko
    Morikawa, Katsumi
    Hirotani, Daisuke
    Yoshikawa, Takeshi
    [J]. International Journal of Manufacturing Technology and Management, 2010, 20 (1-4) : 75 - 93
  • [10] Re-Examining the Performance of MRP and Kanban Material Control Strategies for Multi-Product Flexible Manufacturing Systems
    Ananth Krishnamurthy
    Rajan Suri
    Mary Vernon
    [J]. International Journal of Flexible Manufacturing Systems, 2004, 16 : 123 - 150