Probabilistic Reliability Assessment of Entergy transmission system

被引:0
|
作者
Li, Mei [1 ]
Kolluri, Sharma [1 ]
Agarwal, Sudhir K. [2 ]
机构
[1] Entergy Serv Inc, Transmis Planning, New Orleans, LA 70113 USA
[2] Gen Reliabil, San Diego, CA USA
关键词
Power System reliability; Probabilistic reliability assessment; Contingency analysis; Reliability indices;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper presents probabilistic reliability assessment (PRA) of Entergy transmission system. N-1 and N-2 contingency screening is performed over Entergy transmission system. Both outage probability and the severity of its impact, including overloads and/or low voltage violations are considered by PRA methods. A real case study for Entergy is introduced in this paper. 2018 and 2022 power flow cases are studied for PRA. Entergy transmission system reliability performance changes over time are evaluated. Contribution of transmission planning projects to bulk power system reliability improvement is analyzed based on PRA results. Critical contingencies and weak points of the system are investigated which gives a good guidance on transmission system planning.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Probabilistic assessment of transmission system reliability performance
    Chowdhury, A. A.
    Koval, D. O.
    2006 POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1-9, 2006, : 3019 - +
  • [2] Probabilistic Reliability Analysis in the Norwegian Transmission System
    Bruvik, Katrine
    Hytten, Lars Martin
    2020 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2020,
  • [3] Models for probabilistic power transmission system reliability calculation
    Institute of Energy Technology Aalborg, University Denmark John Been DEFU, P.O. BOX 259, Lyngby, Denmark
    不详
    不详
    IEEE Trans Power Syst, 3 (1166-1171):
  • [4] Probabilistic reliability criterion for planning transmission system expansions
    Choi, J.
    Mount, T. D.
    Thomas, R. J.
    Billinton, R.
    IEE PROCEEDINGS-GENERATION TRANSMISSION AND DISTRIBUTION, 2006, 153 (06) : 719 - 727
  • [5] PROBABILISTIC ASPECTS OF TRANSMISSION SYSTEM SWITCHING SURGE RELIABILITY
    MCELROY, AJ
    CHARKOW, JH
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1967, PA86 (08): : 1012 - &
  • [6] Probabilistic evaluation and planning of power transmission system reliability
    Makvand, Saeid Biglary
    Venkatesh, Bala
    Cheng, Daniel
    Yu, Peng
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2017, 11 (05) : 1119 - 1125
  • [7] Probabilistic reliability assessment of power system operations
    Li, Wenyuan
    Zhou, Jiaqi
    ELECTRIC POWER COMPONENTS AND SYSTEMS, 2008, 36 (10) : 1102 - 1114
  • [8] Probabilistic reliability methods and tools for transmission planning and system analysis
    Xu, Xiaokang
    Edmonds, Michael J. S.
    2006 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS, VOLS 1 AND 2, 2006, : 383 - 388
  • [9] Models for probabilistic power transmission system reliability calculation.
    Bak-Jensen, B
    Bech, J
    Bjerregaard, CG
    Jensen, PR
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) : 1166 - 1171
  • [10] Assessment of probabilistic system effects on the reliability of timber trusses
    Hansson, M
    Thelandersson, S
    MATERIALS AND STRUCTURES, 2002, 35 (253) : 573 - 578