共 50 条
- [4] A flowshop scheduling algorithm to minimize total weighted completion time PROCEEDINGS OF THE 4TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-4, 2002, : 1485 - 1488
- [7] New lower bounds for the blocking flowshop scheduling problem to minimize the total completion time criterion 2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,
- [8] Two-machine flowshop scheduling problem to minimize maximum lateness with bounded setup and processing times KUWAIT JOURNAL OF SCIENCE & ENGINEERING, 2006, 33 (02): : 233 - 252
- [10] Two-machine flowshop scheduling to minimize total completion time with separate setup and removal times INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2002, 9 (03): : 275 - 286