共 50 条
- [1] Distributionally robust resource constrained single machine scheduling [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 130 - 135
- [6] Distributionally robust single machine scheduling with release and due dates over Wasserstein balls [J]. Pei, Zhi (peizhi@zjut.edu.cn), 2025, 174
- [8] A robust scheduling approach for a single machine to optimize a risk measure [J]. 2ND CIRP ROBUST MANUFACTURING CONFERENCE (ROMAC 2014), 2014, 19 : 148 - 153
- [10] Wasserstein distance-based distributionally robust parallel-machine scheduling * [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2023, 120