SLAB TRACK FOR SHARED FREIGHT AND HIGH SPEED PASSENGER SERVICE

被引:0
|
作者
Li, Dingqing [1 ]
Bilow, David [1 ]
Sussmann, Ted [1 ]
机构
[1] Transportat Technol Ctr Inc, Pueblo, CO 81001 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents design and construction details of two types of slab track installed at the Facility for Accelerated Service Testing (FAST), near Pueblo, Colorado. Direct fixation slab track (DFST) and independent dual block track (IDBT) were installed on a 5-degree curve with 4-inch superelevation. The slab track test section was 500 feet long, consisting of 250 feet of DFST and 250 feet of IDBT. The slab track test section was designed to support 39-ton axle load train operations, while maintaining track geometry for highspeed track standards.
引用
收藏
页码:41 / 47
页数:7
相关论文
共 50 条
  • [1] DYNAMIC PERFORMANCE OF LOW VIBRATION SLAB TRACK ON SHARED HIGH-SPEED PASSENGER AND FREIGHT RAILWAY
    He, Qinglie
    Cai, Chengbiao
    Zhu, Shengyang
    Zhang, Jiawei
    Zhai, Wanming
    TRANSPORT, 2018, 33 (03) : 669 - 678
  • [2] Trackbed deflection under combined freight and high speed passenger service
    Sussmann, TR
    Ebersohn, W
    Tomas, M
    Selig, ET
    GEOTECHNICAL ENGINEERING FOR TRANSPORTATION PROJECTS, VOL 2, 2004, (126): : 1602 - 1609
  • [3] Integrated optimization of the train timetable and freight allocation on shared freight and passenger high-speed railway system
    客货混运下高铁运行图与货物配装方案协同优化
    Yang, Li-Xing (lxyang@bjtu.edu.cn), 2025, 40 (01): : 308 - 316
  • [4] Research on engineering model of railway track cost shared by passenger and freight car
    Li, Dai-An
    Hu, Ren-Wei
    Fan, Xiu-Jun
    Liu, Zeng-Jie
    Tiedao Xuebao/Journal of the China Railway Society, 2002, 24 (04):
  • [5] SIMULATING THE EFFECTS OF HIGHER SPEED PASSENGER TRAINS IN SINGLE TRACK FREIGHT NETWORKS
    Sogin, Samuel
    Barkan, Christopher P. L.
    Saat, Mohd Rapik
    PROCEEDINGS OF THE 2011 WINTER SIMULATION CONFERENCE (WSC), 2011, : 3679 - 3687
  • [6] Interlayer damage evolution of CRTS III slab track under passenger and freight train loads
    Zhang, Yaqin
    Gao, Liang
    Zhong, Yanglong
    Wang, Ji
    Huang, Yichen
    CONSTRUCTION AND BUILDING MATERIALS, 2024, 436
  • [7] Load Effect and Fatigue Life Prediction of Prefabricated Slab Track for Mixed Passenger and Freight Railway
    Ren J.
    Tian G.
    Xu J.
    Deng S.
    Xie P.
    Tiedao Xuebao/Journal of the China Railway Society, 2019, 41 (03): : 110 - 116
  • [8] TRAIN PLANNING ON A SINGLE TRACK SHARED-USE PASSENGER AND FREIGHT CORRIDOR WITH DEMAND CONSIDERATIONS
    Talebian, Ahmadreza
    Zou, Bo
    PROCEEDINGS OF THE ASME JOINT RAIL CONFERENCE, 2014, 2014,
  • [9] Dynamic behavior of slab track for high speed trains
    Friedrich, Klaus
    Hubert, Wolfgang
    Pflanz, Gero
    Schmid, Guenther
    Eisenbahningenieur, 2001, 52 (01): : 13 - 16
  • [10] The ties that bind: freight and passenger high-speed rail are interdependent
    Ziolkowski, Michael F.
    JOURNAL OF TRANSPORT GEOGRAPHY, 2012, 22 : 292 - 294