Human Reliability Analysis of Roof Bolting Operation in Underground Coal Mines

被引:4
|
作者
Tu, Junxiang [1 ]
机构
[1] Fuzhou Univ, Coll Mech Engn & Automat, Fuzhou 350116, Fujian, Peoples R China
基金
美国国家科学基金会;
关键词
human error; roof bolting; expert assessment; Bayesian methodology; success likelihood index; MODEL; PROBABILITIES; SLIM;
D O I
10.1002/qre.1933
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Investigations have shown that human error is the most common cause of roof bolting injuries. Human error probability estimation has become a critical issue for human reliability analysis (HRA) of roof bolting operation. Specialist judgment plays a crucial role in quantifying human error probability in the field because of limited availability of empirical data. However, the aggregation of specialist judgment is typically not carried out in a formal way in HRA. In this paper, an approach to combine Bayesian methodology and the success likelihood index method was to build a computable model using information from specialists for HRA of roof bolting operation. A numerical example was used to illustrate the application of the proposed methodology. Copyright (c) 2015 John Wiley & Sons, Ltd.
引用
收藏
页码:2253 / 2261
页数:9
相关论文
共 50 条
  • [1] SAFETY OF ROOF-BOLTING OPERATIONS IN UNDERGROUND COAL-MINES
    HELANDER, MG
    KROHN, GS
    CURTIN, R
    [J]. JOURNAL OF OCCUPATIONAL ACCIDENTS, 1983, 5 (03): : 161 - 175
  • [2] Development of roof bolting use in Polish coal mines
    Nierobisz, A.
    [J]. JOURNAL OF MINING SCIENCE, 2011, 47 (06) : 751 - 760
  • [3] Development of roof bolting use in Polish coal mines
    A. Nierobisz
    [J]. Journal of Mining Science, 2011, 47 : 751 - 760
  • [4] STRATE CONTROL BY ROOF BOLTING IN MOUNTAIN COAL MINES
    GRANT, F
    [J]. CIM BULLETIN, 1973, 66 (731): : 60 - 60
  • [5] Computer simulations help determine safe vertical boom speeds for roof bolting in underground coal mines
    Ambrose, DH
    Bartels, JR
    Kwitowski, AJ
    Gallagher, S
    Battenhouse, TR
    [J]. JOURNAL OF SAFETY RESEARCH, 2005, 36 (04) : 387 - 397
  • [6] Monitoring of Roof Bolting as an Element of the Project of the Introduction of Roof Bolting in Polish Coal Mines-Case Study
    Dyczko, Artur
    Kaminski, Pawel
    Jarosz, Jacek
    Rak, Zbigniew
    Jasiulek, Dariusz
    Sinka, Tomasz
    [J]. ENERGIES, 2022, 15 (01)
  • [7] ROOF BOLTING AT CANMORE MINES LTD
    COCHRANE, TS
    STLOUIS, AV
    [J]. CANADIAN MINING AND METALLURGICAL BULLETIN, 1968, 61 (671): : 273 - &
  • [8] STRATA CONTROL BY ROOF BOLTING IN WESTERN CANADIAN-MOUNTAIN COAL MINES
    GRANT, F
    [J]. CIM BULLETIN, 1973, 66 (739): : 79 - 87
  • [9] Assessment and management of roof fall risks in underground coal mines
    Duzgun, HSB
    Einstein, HH
    [J]. SAFETY SCIENCE, 2004, 42 (01) : 23 - 41
  • [10] Application of nanotechnology for underground roof bolting
    Ramayya, M. S. Venkata
    [J]. PROCEEDINGS OF THE CONFERENCE ON RECENT ADVANCES IN ROCK ENGINEERING (RARE 2016), 2016, 91 : 249 - 252