机构:
City Univ Business Sch, Dept Banking & Finance, Barbican Ctr, London EC2Y 8HB, EnglandCity Univ Business Sch, Dept Banking & Finance, Barbican Ctr, London EC2Y 8HB, England
Milne, A
[1
]
Whalley, AE
论文数: 0引用数: 0
h-index: 0
机构:
City Univ Business Sch, Dept Banking & Finance, Barbican Ctr, London EC2Y 8HB, EnglandCity Univ Business Sch, Dept Banking & Finance, Barbican Ctr, London EC2Y 8HB, England
Whalley, AE
[1
]
机构:
[1] City Univ Business Sch, Dept Banking & Finance, Barbican Ctr, London EC2Y 8HB, England
inventory dynamics;
time to build;
work-in-progress;
the analytic method of lines;
D O I:
10.1016/S0925-5273(00)00116-X
中图分类号:
T [工业技术];
学科分类号:
08 ;
摘要:
We solve two models of time to build, a first, where production cannot be suspended once started and a second, with costless suspension of production, and use a numerical scheme to analyse the implications of these models for the dynamics of aggregate work-in-progress. (C) 2001 Elsevier Science B.V. All rights reserved.
机构:
Univ Birmingham, Ctr West African Studies, African Cultural Anthropol, Birmingham, W Midlands, EnglandUniv Birmingham, Ctr West African Studies, African Cultural Anthropol, Birmingham, W Midlands, England
Barber, Karin
Farias, P. F. de Moraes
论文数: 0引用数: 0
h-index: 0
机构:
Univ Birmingham, Ctr West African Studies, Birmingham, W Midlands, EnglandUniv Birmingham, Ctr West African Studies, African Cultural Anthropol, Birmingham, W Midlands, England