Time to build and aggregate work-in-progress

被引:1
|
作者
Milne, A [1 ]
Whalley, AE [1 ]
机构
[1] City Univ Business Sch, Dept Banking & Finance, Barbican Ctr, London EC2Y 8HB, England
关键词
inventory dynamics; time to build; work-in-progress; the analytic method of lines;
D O I
10.1016/S0925-5273(00)00116-X
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We solve two models of time to build, a first, where production cannot be suspended once started and a second, with costless suspension of production, and use a numerical scheme to analyse the implications of these models for the dynamics of aggregate work-in-progress. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:165 / 175
页数:11
相关论文
共 50 条