共 50 条
- [1] MULTIOBJECTIVE OPTIMAL DESIGN OF A GAS TURBINE COGENERATION PLANT BY A REVISED HIERARCHICAL OPTIMIZATION METHOD [J]. PROCEEDINGS OF THE ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2017, VOL 3, 2017,
- [2] Optimal multistage expansion planning of a gas turbine cogeneration plant [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1996, 118 (04): : 803 - 809
- [3] ROBUST OPTIMAL DESIGN OF A GAS TURBINE COGENERATION PLANT UNDER UNCERTAIN ENERGY DEMANDS AND COSTS [J]. ASME TURBO EXPO: TURBINE TECHNICAL CONFERENCE AND EXPOSITION, 2015, VOL 3, 2015,
- [4] MULTIOBJECTIVE OPTIMIZATION IN UNIT SIZING OF A GAS-TURBINE COGENERATION PLANT [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 1995, 117 (01): : 53 - 59
- [5] Robust optimal design in multistage expansion of a gas turbine cogeneration plant under uncertain energy demands [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2004, 126 (04): : 823 - 830
- [7] Optimal configuration design of gas turbine cogeneration plants by a MILP decomposition approach [J]. PROCEEDINGS OF THE ASME TURBO EXPO, VOL 3, 2007, : 691 - 700
- [8] Optimal design of gas turbine cogeneration plants in consideration of discreteness of equipment capabilities [J]. JOURNAL OF ENGINEERING FOR GAS TURBINES AND POWER-TRANSACTIONS OF THE ASME, 2006, 128 (02): : 336 - 343
- [9] Thermoeconomic optimization of gas turbine cogeneration plants [J]. ENERGY, 2015, 80 : 474 - 485