Generator Black Start validation using synchronized phasor measurement

被引:0
|
作者
Koellner, Kris
Anderson, Chris
Moxley, Roy
机构
关键词
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
History has repeatedly demonstrated the need to start generating units without access to the external power grid. This "Black Start" ability speeds power system recovery from both system instabilities and natural disasters. Readiness for an actual Black Start condition can be demonstrated by bringing a generator up to speed and synchronizing it to the electric system without using any grid power for auxiliary functions. Salt River Project, based in Phoenix, Arizona, conducted an exercise using a number of hydroelectric generating stations and a thermal-generating station. This was a legitimate "Black Start" exercise because every part of the system connecting the hydro and thermal generation was fully isolated (islanded) from the Western Electric Coordinating Council (WECC) power grid. Synchronized phasor measurements, or synchrophasors, provided a real-time measurement of conditions during this Black Start exercise. Frequency and phase angles were monitored both within the island and on the WECC power grid. By using synchrophasor technology, frequency and phase angle in the two systems could be compared in real time without the use of a physical connection. This paper illustrates the use of synchrophasor data to view frequency stability, verify system independence, and observe the synchronization point. Phasor measurement units, together with synchrophasor collector and display software, provided valuable data to operators during the course of the exercise. This paper provides discussion of problems encountered, trade-offs made, and lessons learned during the exercise.
引用
收藏
页码:498 / 504
页数:7
相关论文
共 50 条
  • [1] Generator black start validation using synchronized phasor measurement
    Koellner, Kris
    Anderson, Chris
    Moxley, Roy
    2006 Power Systems Conference Advanced Metering, Protection, Control, Communication, and Distributed Resources, 2006, : 507 - 512
  • [2] Generator black start validation using synchronized phasor measurement
    Koellner, Kris
    Anderson, Chris
    Moxey, Roy
    2006 IEEE/PES Power Systems Conference and Exposition. Vols 1-5, 2006, : 1356 - 1362
  • [3] DSA Using Synchronized Phasor Measurement and Decision Trees
    2014 IEEE PES GENERAL MEETING - CONFERENCE & EXPOSITION, 2014,
  • [4] Using the internet in networking of synchronized phasor measurement units
    Radovanovic, A
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2001, 23 (03) : 245 - 250
  • [5] Development and Experimental Validation of a Super-Synchronized Phasor Measurement Unit
    Varriale, Enrico
    Morante, Quirino
    Vaccaro, Alfredo
    Pepiciello, Antonio
    2019 INTERNATIONAL SYMPOSIUM ON ADVANCED ELECTRICAL AND COMMUNICATION TECHNOLOGIES (ISAECT), 2019,
  • [6] Practical application of synchronized phasor measurement
    Moxey, Roy
    2006 Power Systems Conference Advanced Metering, Protection, Control, Communication, and Distributed Resources, 2006, : 73 - 82
  • [7] Comparative testing of synchronized phasor measurement units
    Depablos, J
    Centeno, V
    Phadke, AG
    Ingram, M
    2004 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1 AND 2, 2004, : 948 - 954
  • [8] Synchronized Phasor Measurement Applications in Power Systems
    De La Ree, Jaime
    Centeno, Virgilio
    Thorp, James S.
    Phadke, A. G.
    IEEE TRANSACTIONS ON SMART GRID, 2010, 1 (01) : 20 - 27
  • [9] Feasibility study of using synchronized phasor measurements for generator dropping controls in the Colstrip system
    Kosterev, DN
    Esztergalyos, J
    Stigers, CA
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1998, 13 (03) : 755 - 761
  • [10] Use of Synchronized Phasor Measurements for Model Validation in ERCOT
    Nuthalapati, Sarma
    Chen, Jian
    Shrestha, Prakash
    Huang, Shun-Hsien
    Adams, John
    Obadina, Diran
    Mortensen, Tim
    Blevins, Bill
    INTERNATIONAL JOURNAL OF EMERGING ELECTRIC POWER SYSTEMS, 2013, 14 (01): : 87 - 93