Calculating total rework costs in Australian construction projects
被引:26
|
作者:
Love, PED
论文数: 0引用数: 0
h-index: 0
机构:
Edith Cowan Univ, We B Ctr, Sch Management Informat Syst, Perth, WA 6027, AustraliaEdith Cowan Univ, We B Ctr, Sch Management Informat Syst, Perth, WA 6027, Australia
Love, PED
[1
]
Edwards, DJ
论文数: 0引用数: 0
h-index: 0
机构:Edith Cowan Univ, We B Ctr, Sch Management Informat Syst, Perth, WA 6027, Australia
Edwards, DJ
机构:
[1] Edith Cowan Univ, We B Ctr, Sch Management Informat Syst, Perth, WA 6027, Australia
[2] Loughborough Univ Technol, Dept Civil & Bldg Engn, Off Highway Plant & Equipment Res Ctr, Loughborough LE11 3TU, Leics, England
In recent years, academic research has focused on identifying the factors that cause construction project rework in an attempt to eradicate its occurrence. The success of these previous studies has been mixed most notably because industry lacked a clear and universal definition of rework. Consequently, findings emanating from studies conducted to date cannot be compared or contrasted and neither can the work be brought together as a homogenous whole. To address this current deficiency, this study first examined previous rework definitions and a priori research in order to develop a clear definition that would placate industry concerns. This definition was then used as the basis for a national questionnaire survey in Australia, which sought to collate data on the total cost of rework; where total cost is a function of direct and indirect rework costs. A total of 161 construction professionals ( from a range of occupations) participated in this study and provided much needed evaluations and personal knowledge of rework costs for recently completed projects. The costs of rework were found to be significant, with the mean direct and indirect cost of rework as a percentage of contract value being 6.4% and 5.9%, respectively. There were significant differences identified between the estimates propagated by respondents, this being between design consultants and project managers. Additionally, there were no significant differences found between rework costs and procurement methods used and project types. The article concludes by suggesting that further work is required to develop a system which is capable of identifying rework and estimating the costs.
机构:Hong Kong Polytech Univ, Dept Bldg & Real Est, Kowloon, Hong Kong, Peoples R China
Josephson, PE
Larsson, B
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Bldg & Real Est, Kowloon, Hong Kong, Peoples R ChinaHong Kong Polytech Univ, Dept Bldg & Real Est, Kowloon, Hong Kong, Peoples R China
Larsson, B
Li, H
论文数: 0引用数: 0
h-index: 0
机构:Hong Kong Polytech Univ, Dept Bldg & Real Est, Kowloon, Hong Kong, Peoples R China