A priority list-based evolutionary algorithm to solve large scale unit commitment problem

被引:0
|
作者
Srinivasan, D [1 ]
Chazelas, J [1 ]
机构
[1] Natl Univ Singapore, Dept Elect & Comp Engn, Singapore, Singapore
关键词
evolutionary algorithms; unit commitment;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Unit Commitment is a large scale short-term optimization problem, in which the main objective is to schedule generation to minimise the total fuel cost or to maximise the total profit over a study period, subject to a large number of constraints that must be satisfied. There exists no exact solution technique with a reasonable computation time to provide optimum solution to the unit commitment problem. In large systems, the problem becomes increasingly complex due to the enormous number of possible combinations of the on and off states of all the generating units in the power system over all the time-points in the study period. As the power industry undergoes radical restructuring, the value of the improved solutions that today's optimization algorithms might yield for this problem is increasing. This paper presents an efficient algorithm for aiding unit commitment decisions in such environments. An evolutionary Algorithm (EA) with problem specific heuristics and genetic operators has been employed to solve the problem. The initial random population is seeded with good solutions using a Priority List method to increase the speed of convergence and improve efficiency of the algorithm. Test results on systems of varying sizes show superiority of this approach compared to other methods reported in the literature.
引用
收藏
页码:1746 / 1751
页数:6
相关论文
共 50 条
  • [1] A Priority List-Based Binary Crow Search Algorithm for Unit Commitment Problem
    Ela, Adel A. Abou El
    El-Sehiemy, Ragab
    Shaheen, Abdullah M.
    Shalaby, Ayman S.
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING RESEARCH IN AFRICA, 2021, 57 : 211 - 224
  • [2] A Modified Priority List-Based MILP Method for Solving Large-Scale Unit Commitment Problems
    Ke, Xinda
    Lu, Ning
    Wu, Di
    Kintner-Meyer, Michael
    [J]. 2015 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2015,
  • [3] A priority list-based fuzzy logic controller for short-term unit commitment problem
    Kumar J.
    Verma A.
    Bhatti T.S.
    [J]. International Journal of Power and Energy Conversion, 2019, 10 (04): : 497 - 511
  • [4] Emerging solution of large-scale unit commitment problem by Stochastic Priority List
    Senjyu, T
    Miyagi, T
    Saber, AY
    Urasaki, N
    Funabashi, T
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2006, 76 (05) : 283 - 292
  • [5] Enhanced List-Based Simulated Annealing Algorithm for Large-Scale Traveling Salesman Problem
    Wang, Lijin
    Cai, Rongying
    Lin, Min
    Zhong, Yiwen
    [J]. IEEE ACCESS, 2019, 7 : 144366 - 144380
  • [6] Evolutionary Computation based Unit Commitment Using Hybrid Priority List Approach
    Govardhan, Manisha
    Roy, Ranjit
    [J]. 2012 IEEE INTERNATIONAL CONFERENCE ON POWER AND ENERGY (PECON), 2012, : 245 - 250
  • [7] A semi-analytical non-iterative primary approach based on priority list to solve unit commitment problem
    Moradi, Saeed
    Khanmohammadi, Sohrab
    Hagh, Mehrdad Tarafdar
    Mohammadi-ivatloo, Behnam
    [J]. ENERGY, 2015, 88 : 244 - 259
  • [8] Optimizing a unit commitment problem using an evolutionary algorithm and a plurality of priority lists
    Tsalavoutis, Vasilios A.
    Vrionis, Constantinos G.
    Tolis, Athanasios I.
    [J]. OPERATIONAL RESEARCH, 2021, 21 (01) : 1 - 54
  • [9] Optimizing a unit commitment problem using an evolutionary algorithm and a plurality of priority lists
    Vasilios A. Tsalavoutis
    Constantinos G. Vrionis
    Athanasios I. Tolis
    [J]. Operational Research, 2021, 21 : 1 - 54
  • [10] A New Priority List Unit Commitment Method for Large-Scale Power Systems
    Elsayed, Abdullah M.
    Maklad, Ahmed M.
    Farrag, Sobhy M.
    [J]. 2017 NINETEENTH INTERNATIONAL MIDDLE-EAST POWER SYSTEMS CONFERENCE (MEPCON), 2017, : 359 - 367