Analysis of a parallel machine scheduling problem with sequence dependent setup times and job availability intervals

被引:40
|
作者
Gedik, Ridvan [1 ]
Rainwater, Chase [2 ]
Nachtmann, Heather [2 ]
Pohl, Ed A. [2 ]
机构
[1] Univ New Haven, Dept Mech & Ind Engn, 300 Boston Post Rd, West Haven, CT 06516 USA
[2] Univ Arkansas, Dept Ind Engn, 4207 Bell Engn Ctr,1 Univ Arkansas, Fayetteville, AR 72701 USA
关键词
Constraint programming; Mixed integer programming; Logic-based Benders decomposition; Scheduling with job availability intervals; Sequence dependent setup times; LARGE NEIGHBORHOOD SEARCH; TRAVELING UMPIRE PROBLEM; COLUMN GENERATION; MIXED-INTEGER; OPTIMIZATION; CONSTRAINTS; WINDOWS; LOGIC; DECOMPOSITION; ALGORITHMS;
D O I
10.1016/j.ejor.2015.11.020
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, we propose constraint programming (CP) model and logic-based Benders algorithms in order to make the best decisions for scheduling non-identical jobs with availability intervals and sequence dependent setup times on unrelated parallel machines in a fixed planning horizon. In this problem, each job has a profit, cost and must be assigned to at most one machine in such a way that total profit is maximized. In addition, the total cost has to be less than or equal to a budget level. Computational tests are performed on a real-life case study prepared in collaboration with the U.S. Army Corps of Engineers (USACE). Our initial investigations show that the pure CP model is very efficient in obtaining good quality feasible solutions but, fails to report the optimal solution for the majority of the problem instances. On the other hand, the two logic-based Benders decomposition algorithms are able to obtain near optimal solutions for 86 instances out of 90 examinees. For the remaining instances, they provide a feasible solution. Further investigations show the high quality of the solutions obtained by the pure CP model. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:640 / 650
页数:11
相关论文
共 50 条
  • [1] Unrelated parallel machine scheduling problem with stochastic sequence dependent setup times
    Tugba Saraç
    Feristah Ozcelik
    Mehmet Ertem
    [J]. Operational Research, 2023, 23
  • [2] Algorithms for the Unrelated Parallel Machine Scheduling Problem with Sequence Dependent Setup Times
    Silva, Luciano Geraldo
    Rego, Marcelo Ferreira
    de Assis, Luciana Pereira
    Andrade, Alessandro Vivas
    [J]. 2018 37TH INTERNATIONAL CONFERENCE OF THE CHILEAN COMPUTER SCIENCE SOCIETY (SCCC), 2018,
  • [3] Unrelated parallel machine scheduling problem with stochastic sequence dependent setup times
    Sarac, Tugba
    Ozcelik, Feristah
    Ertem, Mehmet
    [J]. OPERATIONAL RESEARCH, 2023, 23 (03)
  • [4] The Unrelated Parallel Machines Scheduling Problem with Machine and Job Dependent Setup Times, Availability Constraints, Time Windows and Maintenance Times
    Agardi, Anita
    Nehez, Karoly
    [J]. MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2021, 12 (03) : 15 - 24
  • [5] A GENETIC ALGORITHM FOR THE UNRELATED PARALLEL MACHINE SCHEDULING PROBLEM WITH JOB SPLITTING AND SEQUENCE-DEPENDENT SETUP TIMES - LOOM SCHEDULING
    Eroglu, Duygu Yilmaz
    Ozmutlu, H. Cenk
    Koksal, Seyit Ali
    [J]. TEKSTIL VE KONFEKSIYON, 2014, 24 (01): : 66 - 73
  • [6] A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times
    Vallada, Eva
    Ruiz, Ruben
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 211 (03) : 612 - 622
  • [7] An Exact Approach for the Identical Parallel Machine Scheduling Problem with Sequence-Dependent Setup Times and the Job Splitting Property
    Arbaoui, Taha
    Yalaoui, Farouk
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 721 - 725
  • [8] The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times
    Bruni, M. E.
    Khodaparasti, S.
    Demeulemeester, E.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2020, 123 (123)
  • [9] Job-shop scheduling problem with sequence dependent setup times
    Moghaddas, R.
    Houshmand, M.
    [J]. IMECS 2008: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2008, : 1546 - 1552
  • [10] Parallel Machine Scheduling with Resources Constraint and Sequence Dependent Setup Times
    Hou, Zheng-liang
    Guo, Xiu-ping
    [J]. PROCEEDINGS OF 2012 3RD INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2012), 2013, : 801 - 811