NEH-based heuristics for the permutation flowshop scheduling problem to minimise total tardiness

被引:68
|
作者
Fernandez-Viagas, Victor [1 ]
Framinan, Jose M. [1 ]
机构
[1] Univ Seville, Sch Engn, Ind Management, E-41092 Seville, Spain
关键词
Scheduling; Flowshop; Heuristics; NEH; Tie-breaking mechanism; Tardiness; PFSP; SEQUENCING PROBLEM; FLOWTIME MINIMIZATION; M-MACHINE; SHOP; MAKESPAN; ALGORITHM; DATES; JOBS;
D O I
10.1016/j.cor.2015.02.002
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Since Johnson's seminal paper in 1954, scheduling jobs in a permutation flowshop has been receiving the attention of hundreds of practitioners and researchers, being one of the most studied topics in the Operations Research literature. Among the different objectives that can be considered, minimising the total tardiness (i.e. the sum of the surplus of the completion time of each job over its due date) is regarded as a key objective for manufacturing companies, as it entails the fulfilment of the due dates committed to customers. Since this problem is known to be NP-hard, most research has focused on proposing approximate procedures to solve it in reasonable computation times. Particularly, several constructive heuristics have been proposed, with NEHedd being the most efficient one, serving also to provide an initial solution for more elaborate approximate procedures. In this paper, we first analyse in detail the decision problem depending on the generation of the due dates of the jobs, and discuss the similarities with different related decision problems. In addition, for the most characteristic tardiness scenario, the analysis shows that a huge number of ties appear during the construction of the solutions done by the NEHedd heuristic, and that wisely breaking the ties greatly influences the quality of the final solution. Since no tie-breaking mechanism has been designed for this heuristic up to now, we propose several mechanisms that are exhaustively tested. The results show that some of them outperform the original NEHedd by about 25% while keeping the same computational requirements. (C) 2015 Elsevier Ltd. All rights reserved.
引用
下载
收藏
页码:27 / 36
页数:10
相关论文
共 50 条
  • [1] Effective heuristics and metaheuristics to minimise total tardiness for the distributed permutation flowshop scheduling problem
    Khare, Ankit
    Agrawal, Sunil
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (23) : 7266 - 7282
  • [2] An improved NEH-based heuristic for the permutation flowshop problem
    Dong, Xingye
    Huang, Houkuan
    Chen, Ping
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (12) : 3962 - 3968
  • [3] Efficient constructive and composite heuristics for the Permutation Flowshop to minimise total earliness and tardiness
    Fernandez-Viagas, Victor
    Dios, Manuel
    Framinan, Jose M.
    COMPUTERS & OPERATIONS RESEARCH, 2016, 75 : 38 - 48
  • [4] NEH-Based heuristics for the distributed blocking flowshop with makespan criterion
    Chen, Shuai
    Pan, Quan-ke
    Hu, XiaoLu
    Tasgetiren, M. Fatih
    PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : 1710 - 1715
  • [5] Heuristics in Permutation GOMEA for Solving the Permutation Flowshop Scheduling Problem
    Aalvanger, G. H.
    Luong, N. H.
    Bosman, P. A. N.
    Thierens, D.
    PARALLEL PROBLEM SOLVING FROM NATURE - PPSN XV, PT I, 2018, 11101 : 146 - 157
  • [6] Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lags
    Imen Hamdi
    Taicir Loukil
    Operational Research, 2015, 15 : 95 - 114
  • [7] The Permutation Flow Shop Scheduling Problem with Human Resources: MILP Models, Decoding Procedures, NEH-Based Heuristics, and an Iterated Greedy Algorithm
    Fernandez-Viagas, Victor
    Sanchez-Mediano, Luis
    Angulo-Cortes, Alvaro
    Gomez-Medina, David
    Molina-Pariente, Jose Manuel
    MATHEMATICS, 2022, 10 (19)
  • [8] Permutation flowshop scheduling to minimize the total tardiness with learning effects
    Lee, Wen-Chiung
    Chung, Yu-Hsiang
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 327 - 334
  • [9] Tabu search for non-permutation flowshop scheduling problem with minimizing total tardiness
    Liao, Li-Man
    Huang, Ching-Jen
    APPLIED MATHEMATICS AND COMPUTATION, 2010, 217 (02) : 557 - 567
  • [10] Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lags
    Hamdi, Imen
    Loukil, Taicir
    OPERATIONAL RESEARCH, 2015, 15 (01) : 95 - 114