An integrated model for maintenance policies and production scheduling based on immune-culture algorithm

被引:5
|
作者
Chen, Xiaohui [1 ]
Zhang, Lin [1 ]
Zhang, Ze [1 ]
机构
[1] Chongqing Univ, State Key Lab Mech Transmiss, Chongqing 400030, Peoples R China
基金
中国国家自然科学基金;
关键词
Overall system dependency; competing risks; maintenance policies; production scheduling; AICS-CA; ball screw; PREVENTIVE MAINTENANCE; SYSTEMS; RELIABILITY; COPULA;
D O I
10.1177/1748006X20920048
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The development of integrated modelling for maintenance policies of multi-component repairable system and production scheduling is challenging for two reasons. First, capturing dependency of this multi-component repairable system is difficult because different failure types associated with different components are under competing risks and their complicated relationships may lead to overall system dependency. Second, the integrated model is difficult to optimize because it is an NP-hard problem that exact optimization methods are intractable. For coping with these two difficulties, we propose a parametric statistical model using copula function to capture the overall system dependency. Under partially perfect maintenance policy at component-level, the likelihood functions for observed failures are derived and maximum likelihood method is used to estimate unknown parameters. Then relying on this parametric statistical model, the system hazard function is derived to depict the reliability-based imperfect preventive maintenance policy at system-level. Finally, to obtain the optimal solution(s) of the integrated model, we design an adaptive immune clone selection-culture algorithm, which is inspired from immune clone selection algorithm and culture algorithm. Results of the case study validate that our proposed maintenance policies and methodology have great advantages over the component-level or system-level maintenance policy and immune clone selection algorithm.
引用
收藏
页码:651 / 663
页数:13
相关论文
共 50 条
  • [1] A fuzzy logic approach to an integrated maintenance/production scheduling algorithm
    Sudiarso, A
    Labib, AW
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2002, 40 (13) : 3121 - 3138
  • [2] An Integrated Prognostic based Hybrid Genetic-Immune Algorithm for scheduling jobs and predictive maintenance
    Ladj, Asma
    Tayeb, Fatima Benbouzid-Si
    Varnier, Christophe
    [J]. 2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 2083 - 2089
  • [3] An Optimization Model Integrated Production Scheduling and Preventive Maintenance for Group Production
    Liao, Wenzhu
    Zhang, Xiufang
    Jiang, Min
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 936 - 940
  • [4] AN INTEGRATED MODEL OF PRODUCTION SCHEDULING AND MAINTENANCE PLANNING UNDER IMPERFECT PREVENTIVE MAINTENANCE
    Chen, Xiaohui
    Xiao, Lei
    Zhang, Xinghui
    Xiao, Weixiao
    Li, Junxing
    [J]. EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (01): : 70 - 79
  • [5] An integrated model of production scheduling, maintenance and quality for a single machine
    Duffuaa, Salih
    Kolus, Ahmet
    Al-Turki, Umar
    El-Khalifa, Ahmed
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 142
  • [6] An integrated mathematical model for production scheduling and preventive maintenance planning
    Kolus, Ahmet
    El-Khalifa, Ahmed
    Al-Turki, Umar M.
    Duffuaa, Salih Osman
    [J]. INTERNATIONAL JOURNAL OF QUALITY & RELIABILITY MANAGEMENT, 2020, 37 (6-7) : 925 - 937
  • [7] Single-machine-based production scheduling model integrated preventive maintenance planning
    Ershun Pan
    Wenzhu Liao
    Lifeng Xi
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 50 : 365 - 375
  • [8] Single-machine-based production scheduling model integrated preventive maintenance planning
    Pan, Ershun
    Liao, Wenzhu
    Xi, Lifeng
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (1-4): : 365 - 375
  • [9] Bilevel model and practical algorithm for integrated maintenance scheduling of power systems
    Yu, Dayang
    Han, Xueshan
    Zhao, Jianguo
    [J]. DYNAMICS OF CONTINUOUS DISCRETE AND IMPULSIVE SYSTEMS-SERIES B-APPLICATIONS & ALGORITHMS, 2007, 14 : 1131 - 1135
  • [10] A bilevel programming model and partition searching algorithm for integrated maintenance scheduling
    Yu, Da-Yang
    Han, Xue-Shan
    Zhao, Jian-Guo
    [J]. Dianwang Jishu/Power System Technology, 2010, 34 (04): : 88 - 93