This paper applies a preventive maintenance(PM) policy for a used system to a cumulative damage shock model where the PM is imperfect. Shocks occur according to a nonhomogeneous Poisson process. The system is assumed to fail only by degradation, as only when the total amount of damage exceeds a prespecified level K, still the system undergoes only PM where it take the place of replacement and its Cost is C-K. The system undergoes PM where its cost is c(0) at operating time T, or when the total amount of damage exceeds a level k (k <= K), whichever occurs first. The expected cost rate is obtained and optimal T* and k* to minimize the expected cost are analytically discussed when shocks occur at a homogeneous Poisson process. Several examples are presented.
机构:
City Univ Hong Kong, Dept Syst Engn & Engn Management, Kowloon, Hong Kong, Peoples R China
City Univ Hong Kong, Shenzhen Res Inst, Shenzhen, Peoples R ChinaCity Univ Hong Kong, Dept Syst Engn & Engn Management, Kowloon, Hong Kong, Peoples R China
Wang, Xiaolin
Zhou, Hang
论文数: 0引用数: 0
h-index: 0
机构:
Univ Cambridge, Inst Mfg, Dept Engn, Cambridge CB3 0FS, EnglandCity Univ Hong Kong, Dept Syst Engn & Engn Management, Kowloon, Hong Kong, Peoples R China
Zhou, Hang
Parlikad, Ajith Kumar
论文数: 0引用数: 0
h-index: 0
机构:
Univ Cambridge, Inst Mfg, Dept Engn, Cambridge CB3 0FS, EnglandCity Univ Hong Kong, Dept Syst Engn & Engn Management, Kowloon, Hong Kong, Peoples R China
Parlikad, Ajith Kumar
Xie, Min
论文数: 0引用数: 0
h-index: 0
机构:
City Univ Hong Kong, Dept Syst Engn & Engn Management, Kowloon, Hong Kong, Peoples R China
City Univ Hong Kong, Shenzhen Res Inst, Shenzhen, Peoples R ChinaCity Univ Hong Kong, Dept Syst Engn & Engn Management, Kowloon, Hong Kong, Peoples R China