Optimal Operation of an Industrial Smelter Furnace Off-Gas Cleaning System

被引:0
|
作者
Araujo, Antonio C. B. [1 ]
Brito, Romildo P. [1 ]
Shang, Helen [2 ]
机构
[1] Univ Fed Campina Grande, Av Aprigio Veloso 882, BR-58429900 Campina Grande, PB, Brazil
[2] Laurentian Univ, Sudbury, ON P3E 2C6, Canada
关键词
smelter; furnace; off-gas; optimization; control structure;
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Off-gas cleaning systems extract and treat hazardous emissions, and ensure that smelter operations are in accordance with environmental and industrial hygiene regulations. To this end, it is paramount that a well designed control structure be incorporated into the system. We first approach the problem by conducting a steady-state analysis based on a nonlinear model of the process, where the objective is to achieve safe, clean, and economic operation. Results reveal that this is accomplished by keeping the temperature in the furnace and in the two louvers at their upper bounds (active constraints). The unconstrained variable is found by applying the self-optimizing control technique, and the results indicate that a small loss is acceptable when one of the manipulated variables is fixed. The bottleneck of the system is identified as the fans' discharge pressures when we allow the feed rate as a degree of freedom. A control structure is then designed to keep pressures in the system well within the negative region such that acceptable dynamic performance in face of known, deterministic disturbance is achieved. Nonlinear dynamic simulations showed that very good dynamic performance is achieved with decentralized PI control schemes for both regulatory and supervisory designs.
引用
收藏
页码:1413 / 1418
页数:6
相关论文
共 50 条
  • [1] Dynamic modeling of an industrial roaster off-gas system in a nickel smelter
    Shang, H.
    Mehta, B.
    Thwaites, P.
    Ryan, L.
    Nelson, P.
    [J]. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2007, 46 (16) : 5371 - 5379
  • [2] Potential in utilising furnace off-gas at a ferrochrome smelter with gas engines
    Murray, R.
    de Kock, J. A.
    [J]. PROCEEDINGS OF THE 13TH CONFERENCE ON THE INDUSTRIAL AND COMMERCIAL USE OF ENERGY, 2015, : 171 - 177
  • [3] Optimization of smelter off-gas handling system
    Curson, BC
    Shook, AA
    [J]. SMELTING, TECHNOLOGY DEVELOPMENT, PROCESS MODELING AND FUNDAMENTALS, 1999, : 235 - 243
  • [4] Minimizing leakage from a smelter off-gas system by enhanced control
    Shang, H.
    Scott, J. A.
    [J]. JOURNAL OF CLEANER PRODUCTION, 2011, 19 (01) : 70 - 77
  • [5] Mitigation of energy intensity of an industrial off-gas cleaning system using process engineering solutions
    de Araujo, Antonio C. B.
    Brito, Romildo P.
    Shang, Helen
    [J]. JOURNAL OF CLEANER PRODUCTION, 2009, 17 (16) : 1512 - 1525
  • [6] Hybrid techniques for off-gas cleaning
    Ohlrogge, K
    Herbst, M
    Scheel, H
    Wind, J
    Peinemann, KV
    [J]. CHEMIE INGENIEUR TECHNIK, 2002, 74 (12) : 1679 - 1685
  • [7] Modelling of electric arc furnace off-gas removal system
    Timoshenko, N.
    Semko, A.
    Timoshenko, S.
    [J]. IRONMAKING & STEELMAKING, 2014, 41 (04) : 257 - 261
  • [8] Failure analysis of an electric arc furnace off-gas system
    Gelfi, M.
    Pola, A.
    Roberti, R.
    La Vecchia, G. M.
    Galli, E.
    [J]. ENGINEERING FAILURE ANALYSIS, 2012, 25 : 42 - 48
  • [9] Impala Platinum Smelter, Rustenburg - an integrated smelter off-gas treatment solution
    Westcott, G.
    Tacke, M.
    Schoeman, N.
    Morgan, N.
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2007, 107 (05): : 281 - 287
  • [10] OFF-GAS CLEANING IN AN FRG REPROCESSING PLANT
    FURRER, J
    WEINLANDER, W
    [J]. NUCLEAR TECHNOLOGY, 1990, 92 (01) : 66 - 76