The GI/M/1 queue with start-up period and single working vacation and Bernoulli vacation interruption

被引:8
|
作者
Tao, Li [1 ]
Liu, Zaiming [1 ]
Wang, Zhizhong [1 ]
机构
[1] Cent S Univ, Sch Math, Changsha 410075, Hunan, Peoples R China
关键词
GI/M/1; Start-up period; Working vacation; Vacation interruption; Bernoulli; TIME GI/GEO/1 QUEUE; PERFORMANCE ANALYSIS; M/M/1; QUEUE; M/G/1;
D O I
10.1016/j.amc.2011.10.017
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
Consider a GI/M/1 queue with start-up period and single working vacation. When the system is in a closed state, an arriving customer leading to a start-up period, after the start-up period, the system becomes a normal service state. And during the working vacation period, if there are customers at a service completion instant, the vacation can be interrupted and the server will come back to the normal working level with probability p ( 0 6 p 6 1) or continue the vacation with probability 1 - p. Meanwhile, if there is no customer when a vacation ends, the system is closed. Using the matrix-analytic method, we obtain the steady-state distributions for the queue length at both arrival epochs and arbitrary epochs, the waiting time and sojourn time. (C) 2011 Elsevier Inc. All rights reserved.
引用
收藏
页码:4401 / 4413
页数:13
相关论文
共 50 条
  • [1] An M/G/1 queue with single working vacation and vacation interruption under Bernoulli schedule
    Gao, Shan
    Liu, Zaiming
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (03) : 1564 - 1579
  • [2] The GI/M/1 queue with Bernoulli-schedule-controlled vacation and vacation interruption
    Tao, Li
    Wang, Zhizhong
    Liu, Zaiming
    [J]. APPLIED MATHEMATICAL MODELLING, 2013, 37 (06) : 3724 - 3735
  • [3] Transient Analysis of an M/M/1 Queue with Bernoulli Vacation and Vacation Interruption
    Vijayashree, K. V.
    Janani, B.
    [J]. COMPUTATIONAL INTELLIGENCE, CYBER SECURITY AND COMPUTATIONAL MODELS: MODELS AND TECHNIQUES FOR INTELLIGENT SYSTEMS AND AUTOMATION, 2018, 844 : 214 - 228
  • [4] Analysis of an M/M/1 Queue With Working Vacation and Vacation Interruption
    Majid, Shakir
    Manoharan, P.
    [J]. APPLICATIONS AND APPLIED MATHEMATICS-AN INTERNATIONAL JOURNAL, 2019, 14 (01): : 19 - 33
  • [5] The GI/Geo/1 queue with Bernoulli-schedule-controlled vacation and vacation interruption
    Tao, Li
    Zhang, Liyuan
    Xu, Xuanhua
    Gao, Shan
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (07) : 1680 - 1692
  • [6] THE FUZZY QUEUE WITH SINGLE WORKING VACATION SERVING AT THE SLOWER RATE DURING THE START-UP PERIOD
    Kannadasan, G.
    Sathiyamoorthi, N.
    [J]. ADVANCES AND APPLICATIONS IN MATHEMATICAL SCIENCES, 2021, 20 (05): : 761 - 773
  • [7] Performance analysis of GI/M/1 queue with working vacations and vacation interruption
    Li, Ji-Hong
    Tian, Nai-Shuo
    Ma, Zhan-You
    [J]. APPLIED MATHEMATICAL MODELLING, 2008, 32 (12) : 2715 - 2730
  • [8] The GI/M/1 Queue in a Multi-phase Service Environment with Working Vacations and Bernoulli Vacation Interruption
    Li, Jian-Jun
    Liu, Li-Wei
    [J]. JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF CHINA, 2023, 11 (03) : 627 - 656
  • [9] The GI/M/1 Queue in a Multi-phase Service Environment with Working Vacations and Bernoulli Vacation Interruption
    Jian-Jun Li
    Li-Wei Liu
    [J]. Journal of the Operations Research Society of China, 2023, 11 : 627 - 656
  • [10] An M/M/1 retrial queue with Bernoulli-Schedule-Controlled vacation and vacation interruption
    School of Science, Shandong University of Technology, No. 12 Zhangzhou Road, Zibo, China
    不详
    不详
    [J]. ICIC Express Lett., 12 (3385-3392):