Simplified Recovery Process for Resistive Solder Bond (RSB) Hotspots Caused by Poor Soldering of Crystalline Silicon Photovoltaic Modules Using Resin

被引:6
|
作者
Lee, Koo [1 ,2 ]
Cho, Sung Bae [1 ,3 ]
Yi, Junsin [2 ]
Chang, Hyo Sik [1 ]
机构
[1] Chungnam Natl Univ, Grad Sch Energy Sci & Technol, Daejoen 34134, South Korea
[2] Sungkyunkwan Univ, Coll Informat & Commun Engn, Suwon 16419, South Korea
[3] SK Solar Energy Co Ltd, 112 Jangwookjin Ro, Yeondong Myeon 34013, Sejong, South Korea
关键词
power degradation; poor soldering; module recovery; RSB hotspot; EVA swelling; on-site recovery; PV PANELS; HOT-SPOTS; SOLAR; LIFE; END; SYSTEM; WAFERS;
D O I
10.3390/en15134623
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
When the thickness of the solar cell wafer and the amount of Ag to be used decreases, it is the best method to recover the power of the module after use at a minimum cost and reuse the module itself. Economic recovery technology can be applied to the power degradation, caused by the resistive solder bond (RSB) hotspot by poor soldering, because the recovery process can be simplified compared to the power loss that is often greater than 30%. This study demonstrated a quick recovery of the RSB hotspot with on-site recovery technology applied with resin and verified the performance and long-term reliability of on-site recovery technology, compared to the factory recovery method, where the back sheet is removed and laminated to recover the module. Both the factory and field recovery methods confirmed recovery results closer to the initial rated power output of the samples. Each sample was degraded by the RSB hotspot to -62-65% of the initial power output, and the recovery process successfully recovered it to -96-99%. In on-site recovery, verification of the possible EVA solvothermal swelling, which is the effect of organic solvents contained in the resin on EVA, is essential for verifying the long-term reliability of the recovered module. In this study, the power degradations of the on-site recovered samples after a TC 200 cycle test are -2.14% and -0.95%, respectively, which are within the certification test standard of the new manufacturing module. Existing factory recovery costs not only in the recovery process, but also in a total of 22 stages, such as the transfer of the target module. The largest advantage is that the on-site recovery process can be restarted in the field after only eight stages.
引用
收藏
页数:19
相关论文
empty
未找到相关数据