The Operation Optimization Test of Main Steam Pressure on Large Coal-fired Power Unit

被引:0
|
作者
Kan Weiming [1 ]
Yang Zhiping [2 ]
Zheng Likun [1 ]
Hu Yue [2 ]
Fu ZhongGuang [2 ]
机构
[1] Guangdong Power Grid Corp, Elect Power Res Inst, Guangzhou, Guangdong, Peoples R China
[2] North China Elect Power Univ, Key Lab Condit Monitoring & Control Power Plant E, Beijing, Peoples R China
关键词
Coal-fired Power Unit; Main Steam Pressure; Operation Optimization;
D O I
10.4028/www.scientific.net/AMM.71-78.2055
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In this paper, a sub-critical 600 MW power generating unit produced by Shanghai Turbine Generator Corporation has been used for the operation optimization test of main steam pressure. The test has chosen seven loads and four run ways during peaking loads. The economical sliding pressure operation curve of peak load unit can be obtained from the test. The experimental results show that the unit should choose rated pressure operation when load is larger than 470MW, and choose two valve points sliding pressure operation when load is under 470MW to get the lowest heat consumption.
引用
收藏
页码:2055 / +
页数:2
相关论文
共 50 条
  • [1] Thermoeconomic operation optimization of a coal-fired power plant
    Xiong, Jie
    Zhao, Haibo
    Zhang, Chao
    Zheng, Chuguang
    Luh, Peter B.
    [J]. ENERGY, 2012, 42 (01) : 486 - 496
  • [2] Optimization model of steam coal blending in coal-fired power plant
    Zhao, Jian
    Liu, Shi-Xin
    [J]. Dongbei Daxue Xuebao/Journal of Northeastern University, 2015, 36 (10): : 1388 - 1392
  • [3] Sliding Mode Predictive Control of Main Steam Pressure in Coal-fired Power Plant Boiler
    Shi Yuanhao
    Wang Jingcheng
    Zhang Yunfeng
    [J]. CHINESE JOURNAL OF CHEMICAL ENGINEERING, 2012, 20 (06) : 1107 - 1112
  • [4] Optimization of the dynamic performance of coal-fired steam power plant
    Trautmann, Gunter
    Doring, Michael
    Heim, Michael
    Schneider, Peter K.
    [J]. VDI Berichte, 2007, (1980): : 173 - 182
  • [5] Data Mining-based Operation Optimization of Large Coal-fired Power Plants
    Wang, Ningling
    Zhang, Yong
    Zhang, Ting
    Yang, Yongping
    [J]. CONFERENCE ON MODELING, IDENTIFICATION AND CONTROL, 2012, 3 : 607 - 612
  • [6] Flexible Operation Mode of Coal-fired Power Unit Coupling with Heat Storage of Extracted Reheat Steam
    Wei Haijiao
    Lu Yuanwei
    Yang Yanchun
    Zhang Cancan
    Wu Yuting
    Li Weidong
    Zhao Dongming
    [J]. JOURNAL OF THERMAL SCIENCE, 2022, 31 (02) : 436 - 447
  • [7] Flexible Operation Mode of Coal-fired Power Unit Coupling with Heat Storage of Extracted Reheat Steam
    WEI Haijiao
    LU Yuanwei
    YANG Yanchun
    ZHANG Cancan
    WU Yuting
    LI Weidong
    ZHAO Dongming
    [J]. Journal of Thermal Science, 2022, 31 (02) : 436 - 447
  • [8] Flexible Operation Mode of Coal-fired Power Unit Coupling with Heat Storage of Extracted Reheat Steam
    Haijiao Wei
    Yuanwei Lu
    Yanchun Yang
    Cancan Zhang
    Yuting Wu
    Weidong Li
    Dongming Zhao
    [J]. Journal of Thermal Science, 2022, 31 : 436 - 447
  • [9] Selection of the optimal initial steam pressure for coal-fired power units
    Zhang, CF
    Li, YL
    Wang, HJ
    Zhang, B
    Xie, F
    Huang, Y
    [J]. Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 1835 - 1838
  • [10] Multivariable constrained predictive control of main steam temperature in ultra-supercritical coal-fired power unit
    Wang, Guo-Liang
    Yan, Wei-Wu
    Chen, Shi-He
    Zhang, Xi
    Shao, Hui-He
    [J]. JOURNAL OF THE ENERGY INSTITUTE, 2015, 88 (02) : 181 - 187