QUALITY ASSURANCE OF ASPHALT PAVEMENT

被引:0
|
作者
Cihlarova, Denisa [1 ]
Mondschein, Petr [2 ]
机构
[1] VSB Tech Univ Ostrava, Ostrava, Czech Republic
[2] Czech Tech Univ, Prague, Czech Republic
关键词
Asphalt mixture; compaction; quality control; destructive method; non-destructive method; Nuclear Density Gauge; Electrical Density Gauges; COMPACTION;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
When laying asphalt layers, the compaction plays an important role. It also ensures the mutual arrangement of the various parts of the asphalt mixture so that the mixture reaches the optimal properties in terms of endurance, strength in terms of climatic conditions; thus guaranteed the desired lifetime period of the layer. The degree of compaction is characterized by the ratio of density found on the layer (destructive, non-destructive) and the reference volume density (Marshall body, control production test of the given section). The paper analyses the destructive and non-destructive methods for checking the degree of compaction of asphalt layers. The data obtained during laying ACO 11+ 50 mm thickness. The volume density was determined by using probes Troxler 3440, Troxler 2701 and from the boreholes in these given locations. According to the analysis accuracy, the probe Troxler 2701 used to determine the final degree of compaction of the construction asphalt layer and for the routine control of compaction is not suitable.
引用
收藏
页码:229 / 236
页数:8
相关论文
共 50 条
  • [1] Time of sampling strategies for asphalt pavement quality assurance
    McCabe, B
    AbouRizk, S
    Gavin, J
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (01): : 85 - 89
  • [2] Suitability of Intelligent Compaction for Asphalt Pavement Quality Control and Quality Assurance
    Yoon, Soojin
    Hastak, Makarand
    Lee, Jusang
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (04)
  • [3] The use of a thermal camera for quality assurance of asphalt pavement construction
    Nevalainen, Niklas
    Pellinen, Terhi
    [J]. INTERNATIONAL JOURNAL OF PAVEMENT ENGINEERING, 2016, 17 (07) : 626 - 636
  • [4] GPR in road investigations - equipment tests and quality assurance of new asphalt pavement
    Poikajarvi, Janne
    Peisa, Kari
    Herronen, Tomi
    Aursand, Per Otto
    Maijala, Pekka
    Narbro, Anita
    [J]. NONDESTRUCTIVE TESTING AND EVALUATION, 2012, 27 (03) : 293 - 303
  • [5] Effective control of flexible asphalt pavement cracking through quality assurance testing of extracted and recovered binders
    Li, Yiming
    Ding, Haibo
    Nie, Yihua
    Hesp, Simon A. M.
    [J]. CONSTRUCTION AND BUILDING MATERIALS, 2021, 273
  • [6] Quality Assurance in Asphalt Recycling.
    Bellin, Peter
    Rode, Franz
    [J]. 1600, (36):
  • [7] Quality assurance in the construction and maintenance of asphalt pavementsQuality assurance in the construction and maintenance of asphalt pavements
    Srsen, Mate
    [J]. Gradevinar, 1994, 46 (03):
  • [8] Application of Pavement Quality Indicator in the Construction Quality Instant Control of Asphalt Pavement
    Guo Dedong
    [J]. MEASUREMENT TECHNOLOGY AND ENGINEERING RESEARCHES IN INDUSTRY, PTS 1-3, 2013, 333-335 : 1691 - 1694
  • [9] Comparison of quality control and quality assurance for asphalt concrete
    Chen, Jian-Shiuh
    Wang, Ching-Hsiung
    Chen, Jing-Wen
    [J]. Journal of the Chinese Institute of Civil and Hydraulic Engineering, 2010, 22 (04): : 447 - 455
  • [10] Performance Related Quality Assurance in Pavement Construction
    Cafiso, Salvatore Damiano
    Capace, Brunella
    Di Graziano, Alessandro
    [J]. PROCEEDINGS OF THE 5TH INTERNATIONAL SYMPOSIUM ON ASPHALT PAVEMENTS & ENVIRONMENT (APE), 2020, 48 : 470 - 479