Performance Evaluation of Hydro Generating Units Through the AHP Method

被引:4
|
作者
Oliveira Silva, Patricia de Sousa [1 ]
de Oliveira, Marcos T. B. [2 ]
Oliveira, Elisa [2 ]
Conceicao, Lucas R. [2 ]
Junqueira, Giovani S. [3 ]
Marcato, Andre L. M. [2 ]
Cyrino Oliveira, Fernando Luiz [1 ]
机构
[1] Pontifical Catholic Univ Rio de Janeiro, R Marques de Sao Vicente, BR-22541041 Rio De Janeiro, Brazil
[2] Univ Fed Juiz de Fora, Rua Jose Lourenco Kalmer S-N, BR-36036900 Juiz De Fora, MG, Brazil
[3] Santo Antonio Energia, Porto Velho, RO, Brazil
关键词
Analytic hierarchy process; Availability factor; Hydro plant; Maintenance; Water turbine; MITIGATING HYDROLOGICAL RISK; MAINTENANCE;
D O I
10.1007/s40313-021-00839-1
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The present work aims to obtain a ranking of hydro generating units using the analytic hierarchy process (AHP) method, based on the maintenance indicators of the Santo Antonio Hydroelectric Plant (SAHP). The purpose of the generated classification is to provide subsidies to assist maintenance planning, determining the most critical turbines for performing preventive maintenance, in order to increase the availability of equipment, in addition to reducing the probabilities of forced shutdowns for corrective maintenance, impacting factors the plant's availability factor. Thus, the main contribution of this work is the application of AHP to classify the SAHP generating units, using parameters and actual historical data from the plant and hydraulic turbines.
引用
收藏
页码:1056 / 1065
页数:10
相关论文
共 50 条
  • [1] Performance Evaluation of Hydro Generating Units Through the AHP Method
    Patrícia de Sousa Oliveira Silva
    Marcos T. B. de Oliveira
    Elisa Oliveira
    Lucas R. Conceição
    Giovani S. Junqueira
    André L. M. Marcato
    Fernando Luiz Cyrino Oliveira
    [J]. Journal of Control, Automation and Electrical Systems, 2022, 33 : 1056 - 1065
  • [2] Economic performance evaluation method for hydroelectric generating units
    Liu, YQ
    Ye, LQ
    Benoit, I
    Liu, XL
    Cheng, YC
    Morel, G
    Fu, C
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2003, 44 (06) : 797 - 808
  • [3] HYDRO GENERATING UNITS MAINTENANCE SCHEDULING USING BENDERS DECOMPOSITION
    Kuzle, Igor
    Pandzic, Hrvoje
    Brezovec, Miljenko
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2010, 17 (02): : 145 - 152
  • [4] PREDICTING PERFORMANCE OF GENERATING UNITS
    LAPIDES, ME
    [J]. POWER ENGINEERING, 1977, 81 (10) : 52 - 55
  • [5] Black Start Capability of Synchronous and Asynchronous Hydro Generating Units
    Verma, Surabhi
    Kumari, Rupesh
    Chelliah, Thanga Raj
    [J]. 2022 IEEE INTERNATIONAL CONFERENCE ON POWER ELECTRONICS, DRIVES AND ENERGY SYSTEMS, PEDES, 2022,
  • [7] AN INTEGRATED FUZZY AHP/DEA APPROACH FOR PERFORMANCE EVALUATION OF TERRITORIAL UNITS IN TURKEY
    Calik, Ahmet
    Yapici Pehlivan, Nimet
    Kahraman, Cengiz
    [J]. TECHNOLOGICAL AND ECONOMIC DEVELOPMENT OF ECONOMY, 2018, 24 (04) : 1280 - 1302
  • [8] EVALUATION OF PERFORMANCE OF CONTAINER TERMINALS THROUGH DEMATEL-AHP
    Venkatasubbaiah, K.
    Rao, K. Narayana
    Rao, M. Malleswara
    [J]. INTERNATIONAL JOURNAL FOR QUALITY RESEARCH, 2014, 8 (04) : 533 - 542
  • [9] Virtual environment conception for CBM of hydro-electric generating units
    Guo, J
    Li, ZH
    Chen, YT
    Wang, YW
    Cheng, SJ
    [J]. POWERCON 2002: INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY, VOLS 1-4, PROCEEDINGS, 2002, : 1957 - 1961
  • [10] OPTIMUM ALLOCATION OF DISCHARGE TO UNITS IN A HYDRO-ELECTRIC GENERATING STATION
    BERNHOLTZ, B
    [J]. SIAM REVIEW, 1960, 2 (04) : 247 - 258