Construction QA/QC Methods for Postgrouting Drilled Shafts

被引:6
|
作者
Mullins, Gray [1 ]
机构
[1] Univ S Florida, 4202 E Fowler Ave,ENB 118, Tampa, FL 33620 USA
关键词
Grouting;
D O I
10.1061/(ASCE)CF.1943-5509.0000827
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The design and anticipated end-bearing capacity of postgrouted drilled shafts hinge on achieving sufficient grout pressure applied to the soils beneath the shaft tip. Implied, however, is that the grout is distributed reasonably well across the entire tip area. To this end, minimum grout pressure and volume thresholds are usually prescribed in an effort to address both concerns. Unfortunately, it is difficult to practically ascertain the actual area of the grout bulb during production grouting when manually-recorded values of pressure, volume, and uplift are the only available information. Therein, artificially-high grout pressure can be recorded, resulting from a blocked grout-distribution system that goes undetected and the shaft is accepted as both the minimum pressure and volume criteria were satisfied. This article outlines minimum monitoring practices and field quality-assurance/quality-control (QA/QC) measures that can and should be used to better ensure tip grouting is performed in conformance with the designer's expectations and intended outcome. The value of the proposed standard of care is highlighted through case studies where drilled shafts for bridge foundations were constructed, grouted, and met all acceptance criteria but where they were not grouted satisfactorily. (C) 2015 American Society of Civil Engineers.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] DESIGN AND CONSTRUCTION OF DRILLED SHAFTS
    REESE, LC
    JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1978, 104 (01): : 95 - 116
  • [2] DESIGN AND CONSTRUCTION OF DRILLED SHAFTS
    Reese, Lymon C.
    1978, 104 (01): : 91 - 126
  • [3] DESIGN AND CONSTRUCTION OF DRILLED SHAFTS - DISCUSSION
    SULAIMAN, IH
    JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1978, 104 (10): : 1331 - 1332
  • [4] DESIGN AND CONSTRUCTION OF DRILLED SHAFTS - CLOSURE
    REESE, LC
    JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1979, 105 (06): : 795 - 796
  • [5] Class-A prediction of construction defects in drilled shafts
    Iskander, M
    Roy, D
    Ealy, C
    Kelley, S
    SOIL MECHANICS 2001: SOILS, GEOLOGY, AND FOUNDATIONS, 2001, (1772): : 73 - 83
  • [6] Class-A prediction of construction defects in drilled shafts
    Iskander, Magued
    Roy, Douglas
    Ealy, Carl
    Kelley, Shawn
    Transportation Research Record, 2001, (1772) : 73 - 83
  • [7] Corrosion of reinforcing steel in drilled shafts with construction flaws
    Sarhan, HA
    O'Neill, MW
    Simon, PD
    GEOLOGY AND PROPERTIES OF EARTH MATERIALS 2002: SOIL, GEOLOGY, AND FOUNDATIONS, 2002, (1786): : 96 - 103
  • [8] Effect of Construction Induced Vibrations on Green Concrete in Drilled Shafts
    Tawfiq, Kamal
    Mtenga, Primus
    Sobanjo, John
    JOURNAL OF MATERIALS IN CIVIL ENGINEERING, 2010, 22 (06) : 637 - 642
  • [9] METHODOLOGY FOR DESIGN AND CONSTRUCTION OF DRILLED SHAFTS IN COHESIVE SOILS.
    Johnson, Lawrence D.
    Technical Report - US Army Engineer Waterways Experiment Station, 1984,
  • [10] Effect of construction induced vibrations on green concrete in drilled shafts
    Dept. of Civil Engineering, College of Engineering, FAMU-FSU, Tallahassee, FL 32310, United States
    不详
    不详
    J. Mater. Civ. Eng., 6 (637-642):