Construction of the Early-warning Index System for the Risk of the International Logistics Operation

被引:0
|
作者
Zhang, Guohua [1 ]
Yuan, Jiali [2 ]
机构
[1] Hebei Univ Sci & Technol, Sch Econ & Management, Shijiazhuang, Peoples R China
[2] Hebei Univ Sci & Technol, Sch Foreign Languages, Shijiazhuang, Peoples R China
关键词
Early-warning; Index System; International Logistics Operation; Risk;
D O I
10.1109/ICACC.2010.5487260
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Early warning index system of the risk in international logistics operation refers to the premise of warning system carrying out identification, diagnosis, pre-control activities. It is an organic whole in which a series of interrelated and specific indicators sensitively reflecting the state of international logistics operations and problems. The early warning index system for the risk of international logistics operation consists of 6 categories of secondary indexes. They are international procurement risk, storage risk, international transport risk, loading and carry operations risk, flow and processing risk, and handling of information risk of international logistics, and there are also 21 third-degree indexes.
引用
收藏
页码:209 / 213
页数:5
相关论文
共 50 条
  • [1] Design for an Early Warning Index System of the Risk in Logistics Operation
    Zhang, Guohua
    Dou, Hairong
    [J]. ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 217 - 220
  • [2] Method of enterprise marketing risk early-warning and the index system construction
    Zhou Mei-hua
    Wang Fu-dong
    Zhang Hong-hong
    Meng Jan
    [J]. 2006 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY, VOLS 1 AND 2, PROCEEDINGS, 2006, : 718 - +
  • [3] Construction and operation of enterprise's early-warning management system
    Wang Yulin
    Diao Zhaofeng
    [J]. Proceedings of 2005 International Conference on Innovation & Management, 2005, : 1223 - 1225
  • [4] The financial risk index system and early-warning research
    Zhu Honghan
    Liu Xiangyun
    [J]. PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MECHATRONICS, ROBOTICS AND AUTOMATION (ICMRA 2015), 2015, 15 : 443 - 447
  • [5] Construction of Risk Early-warning System for Technology Innovation in Enterprises
    Yang, Chao
    Pan, Ping
    [J]. PROCEEDINGS OF THE SECOND CHINA PRIVATE ECONOMY INNOVATION INTERNATIONAL FORUM, 2009, : 16 - 19
  • [6] On the construction of an early-warning system for systematic risk in China's banking
    Tang Lingxiao
    Fan Xiaofeng
    [J]. MODERN FINANCE AND GLOBAL TRADING COOPERATION: PROCEEDINGS OF THE 5TH INTERNATIONAL ANNUAL CONFERENCE ON WTO AND FINANCIAL ENGINEERING, 2008, : 33 - 39
  • [7] Construction of an Early-Warning System for Vegetable Prices Based on Index Contribution Analysis
    Li, Youzhu
    Xia, Jingbo
    Li, Chongguang
    Zheng, Mingyang
    [J]. SUSTAINABILITY, 2015, 7 (04) : 3823 - 3837
  • [8] Risk Assessment and Early-Warning System for High-Speed Railway during the Construction and Operation of Underpass Bridges
    He, Wei
    Duan, Yinlong
    Deng, Liwen
    Zhou, Weiguang
    [J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (01)
  • [9] Research on the Early-warning for Construction Project Cost Risk
    Liu Zi-mei
    Xie Ke-fan
    [J]. 2013 FOURTH INTERNATIONAL CONFERENCE ON DIGITAL MANUFACTURING AND AUTOMATION (ICDMA), 2013, : 1127 - 1129
  • [10] A discussion of the credit risk early-warning system
    Zeng, FW
    [J]. PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 1833 - 1837