High speed railway track dynamic behavior near critical speed

被引:12
|
作者
Gao, Yin [1 ]
Huang, Hai [2 ]
Ho, Carlton L. [3 ]
Hyslip, James P. [4 ]
机构
[1] Transportat Technol Ctr Inc, 55500 Dot Test Rd, Pueblo, CO 81006 USA
[2] Penn State Univ, 3000 Ivyside Pk, Altoona, PA 16801 USA
[3] Univ Massachusetts, 28 Marston Hall, Amherst, MA 01003 USA
[4] HyGround Engn LLC, POB 324, Williamsburg, MA 01096 USA
关键词
Critical speed; Site investigation; High speed rail; 3-D modeling; Soft subgrade; GROUND VIBRATIONS; TRAINS; PREDICTION;
D O I
10.1016/j.soildyn.2017.08.001
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
This study was performed on the Amtrak Northeast Corridor (NEC) at Kingston, Rhode Island where is known as the Great Swamp and requires more frequent track maintenance. It was suspected that the so-called "critical speed" condition might exist at this particular location. The critical speed is the speed at which trains travel on the soft subgrade close to or higher than the Rayleigh wave velocity of the subgrade soil. The conventional understanding of the "critical speed" would expect both a cone-shaped ground wave motion and substantial amount of track deflections. Field investigations combined with a validated 3-D dynamic track-subgrade interaction model were used to evaluate the track performance and determine if the critical speed effect exists at the Kingston site. The track performance was investigated by a three-by-three (3 x 3) array of accelerometers. Site investigations were carried out to characterize the site and provide input data for modeling. According to the field measurements and model results, the rail did not show excessive deflections; however, ground surface wave propagation had been detected with a cone-shaped mode. In other words, the cone-shaped ground wave motion and the increase in rail deflection did not occur at the same time as the conventional understanding. In addition, the model results pointed out that the stress level in the subgrade would encounter a significant increase under the current operational speeds (less than 250 km/h) rather than excessive rail deflections and the rail deflections will increase dramatically at the simulated train speeds of over 300 km/h. Therefore, the "critical speed" is defined in two levels for the Kingston site: 1) The speed causing significant stress increase in the ballast and subgrade, at which more frequent ballast maintenance is needed; 2) The speed causing significant increase in rail deflection, at which derailment becomes a concern.
引用
收藏
页码:285 / 294
页数:10
相关论文
共 50 条
  • [1] Analysis of the Track Critical Velocity in High-Speed Railway
    Zhang, Wan-Kai
    Yuan, Li
    Cui, Zhen-Dong
    [J]. RECENT ADVANCES IN GEO-ENVIRONMENTAL ENGINEERING, GEOMECHANICS AND GEOTECHNICS, AND GEOHAZARDS, 2019, : 367 - 369
  • [2] Analysis of Dynamic Behavior for Slab Track of High-Speed Railway Based on Vehicle and Track Elements
    Lei, Xiaoyan
    Zhang, Bin
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING, 2011, 137 (04) : 227 - 240
  • [3] Space dynamic analysis of track structure of high speed railway
    Lei, XY
    Chen, SS
    [J]. TRAFFIC AND TRANSPORTATION STUDIES, 2000, : 770 - 775
  • [4] Experimental settlement and dynamic behavior of a portion of ballasted railway track under high speed trains
    Al Shaer, A.
    Duhamel, D.
    Sab, K.
    Foret, G.
    Schmitt, L.
    [J]. JOURNAL OF SOUND AND VIBRATION, 2008, 316 (1-5) : 211 - 233
  • [5] Dynamic behavior of high-speed railway tracks
    Zakeri, JA
    He, X
    Fan, JJ
    [J]. TRAFFIC AND TRANSPORTATION STUDIES, 2000, : 971 - 976
  • [6] Analysis of vehicle dynamic behavior under ballasted track irregularities in high-speed railway
    Cai, Xiaopei
    Zhao, Lining
    Lau, Albert Leong Lee
    Tan, Shiyu
    Cui, Rixin
    [J]. Noise and Vibration Worldwide, 2015, 46 (10): : 10 - 17
  • [7] Design of Railway Track for Speed and High-speed Railways
    Hodas, Stanislav
    [J]. XXIII R-S-P SEMINAR, THEORETICAL FOUNDATION OF CIVIL ENGINEERING (23RSP) (TFOCE 2014), 2014, 91 : 256 - 261
  • [8] Track dynamic behavior at rail welds at high speed
    Guangwen Xiao·Xinbiao Xiao·Jun Guo·Zefeng Wen·Xuesong Jin State Key Laboratory of Traction Power
    [J]. Acta Mechanica Sinica, 2010, (03) : 449 - 465
  • [9] Dynamic behavior of slab track for high speed trains
    Friedrich, Klaus
    Hubert, Wolfgang
    Pflanz, Gero
    Schmid, Guenther
    [J]. Eisenbahningenieur, 2001, 52 (01): : 13 - 16
  • [10] Track dynamic behavior at rail welds at high speed
    Xiao, Guangwen
    Xiao, Xinbiao
    Guo, Jun
    Wen, Zefeng
    Jin, Xuesong
    [J]. ACTA MECHANICA SINICA, 2010, 26 (03) : 449 - 465