Job shop bottleneck detection based on orthogonal experiment

被引:19
|
作者
Zhai, Yingni [1 ]
Sun, Shudong [1 ]
Wang, Junqiang [1 ]
Niu, Ganggang [1 ]
机构
[1] Northwestern Polytech Univ, Sch Mechatron, Inst Syst Integrat & Engn Management, Xian 710072, Shaanxi Provinc, Peoples R China
基金
中国国家自然科学基金;
关键词
Job shop; Prior-to-run; Bottleneck detection; Orthogonal experiment; SCHEDULING PROBLEMS; SYSTEMS;
D O I
10.1016/j.cie.2011.05.021
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
A new prior-to-run bottleneck detection method based on orthogonal experiment (BD-OE) is proposed for job shop from the perspective of scheduling. It is built according to a new bottleneck definition which is proposed based on the principle of "Bottlenecks determine the performance of manufacturing systems" in TOC. The method takes the scheduling objective as estimated index, and constructs orthogonal trials by orthogonal array and dispatching rules to detect the bottleneck machine which has the greatest effect on the estimated index. It can detect the bottleneck machine before manufacturing systems run, and guide the following production process for the improvement of the performance of manufacturing systems. In order to evaluate the performance of the proposed method, different scales of job shop scheduling instances and two existing bottleneck detection methods are selected for simulation. The results show that the prior-to-run bottleneck detection method is feasible, efficient and easily implemented. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:872 / 880
页数:9
相关论文
共 50 条
  • [1] Bottleneck detection method based on orthogonal experiment for Job Shop
    Zhai, Ying-Ni
    Sun, Shu-Dong
    Wang, Jun-Qiang
    Wang, Meng
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1945 - 1952
  • [2] Workload smoothing in a bottleneck job shop
    Salegna, GJ
    Park, PS
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1996, 16 (01) : 91 - &
  • [3] Workload smoothing in a bottleneck job shop
    Int J Oper Prod Manage, 1 (91):
  • [4] Schedule-based execution bottleneck identification in a job shop
    Wang, Jun-Qiang
    Chen, Jian
    Zhang, Yingqian
    Huang, George Q.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 98 : 308 - 322
  • [5] Bottleneck Detection in Job Shop Production by High-Level Petri Nets
    Esmaeeli, Hamid
    Aleahmad, Matin
    PROCEEDINGS OF 2019 15TH IRAN INTERNATIONAL INDUSTRIAL ENGINEERING CONFERENCE (IIIEC), 2019, : 178 - 183
  • [6] Identification approach for bottleneck cluster in a Job Shop
    Wang, Jun-Qiang
    Kang, Yong
    Chen, Jian
    Guo, Yin-Zhou
    Zhang, Ying-Feng
    Sun, Shu-Dong
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2013, 19 (03): : 540 - 551
  • [7] An algorithm based on taboo search and shifting bottleneck for job shop scheduling
    Huang, Z
    Huang, WQ
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 560 - 564
  • [8] Algorithm based on taboo search and shifting bottleneck for job shop scheduling
    Huang, WQ
    Huang, Z
    JOURNAL OF COMPUTER SCIENCE AND TECHNOLOGY, 2004, 19 (06) : 776 - 781
  • [9] THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING
    ADAMS, J
    BALAS, E
    ZAWACK, D
    MANAGEMENT SCIENCE, 1988, 34 (03) : 391 - 401
  • [10] Algorithm based on taboo search and shifting bottleneck for job shop scheduling
    Wen-Qi Huang
    Zhi Huang
    Journal of Computer Science and Technology, 2004, 19 : 776 - 781