Analysis of parts requirements variance for a JIT supply chain

被引:17
|
作者
Aigbedo, H [1 ]
机构
[1] Oakland Univ, Sch Business Adm, Dept Informat & Decis Sci, Rochester, MI 48309 USA
关键词
D O I
10.1080/00207540310001614178
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Metrics used to assess level parts usage for some JIT supply chains are based on the product-unit by product-unit launch of products on the assembly line. However, many automobile assembly plants require parts suppliers to deliver parts to the assembly line by using a constant order cycle, non-constant order quantity framework. The paper proposes metrics that are suited to this parts delivery framework. Through extensive simulation over a wide range of assembly parameter values, it assesses the ability of supplier plants to match assembly requirements at each supply epoch. Among other things, the study finds that the conventional JIT scheduling framework also works well in general under this parts delivery arrangement, but acute parts stockout conditions could sometimes occur. Therefore, managers need to consider this in determining appropriate inventory levels for each part. This will prevent stockouts and reduce supply chain costs.
引用
收藏
页码:417 / 430
页数:14
相关论文
共 50 条
  • [1] MANAGEMENT CONTROL IN SUPPLY CHAIN JIT
    BAXTER, LF
    FERGUSON, N
    MACBETH, DK
    NEIL, GC
    [J]. JIT IS HERE TO STAY: MANAGING FOR SUCCESS, 1989, : 145 - 153
  • [2] VARIANCE ANALYSIS, KANBAN AND JIT - A FURTHER STUDY
    JAOUEN, PR
    NEUMANN, BR
    [J]. JOURNAL OF ACCOUNTANCY, 1987, 163 (06): : 164 - +
  • [3] An analysis of a supply chain with options contracts and service requirements
    Chen, Xu
    Shen, Zuo-Jun
    [J]. IIE TRANSACTIONS, 2012, 44 (10) : 805 - 819
  • [4] Total JIT (T-JIT) and its impact on supply chain competency and organizational performance
    Green, Kenneth W., Jr.
    Inman, R. Anthony
    Birou, Laura M.
    Whitten, Dwayne
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 147 : 125 - 135
  • [5] Supply chain design in the electronics industry incorporating JIT purchasing
    Singh, Om Pal
    Chand, Satish
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2009, 3 (01) : 21 - 44
  • [6] Joint Optimal Lot Size Policy for a JIT Supply Chain
    Wang Weihua
    Yang Xiaoyan
    [J]. LOGISTICS RESEARCH AND PRACTICE IN CHINA, 2008, : 259 - 264
  • [7] Analysis of Variance Amplification and Service Level in a Supply Chain with Correlated Demand
    Shaban, Ahmed
    Shalaby, Mohamed A.
    Di Gravio, Giulio
    Patriarca, Riccardo
    [J]. SUSTAINABILITY, 2020, 12 (16)
  • [8] Mean-variance analysis for supply chain coordination with the combined contract
    Liu, B
    Liu, SF
    Chen, J
    Ren, YY
    [J]. 2005 IEEE NETWORKING, SENSING AND CONTROL PROCEEDINGS, 2005, : 650 - 655
  • [9] Integrating the spare parts supply chain
    Martin, H.
    Parodi, A.
    Pintelon, L.
    Polychronakis, Y. E.
    Syntetos, A. A.
    [J]. 2008 INTERNATIONAL CONFERENCE TECHNOLOGY MANAGEMENT AND INNOVATION IN CHINA: CHALLENGES AND OPPORTUNITIES IN THE 21ST CENTURY, BOOKS I AND II, 2008, : 1326 - 1343
  • [10] Impact of just-in-time (JIT) on supply chain disruption risk: the moderating role of supply chain centralization
    Ye, Yuxiao
    Suleiman, Mohammed Ali
    Huo, Baofeng
    [J]. INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2022, 122 (07) : 1665 - 1685