Transmission Network Expansion Planning Considering Line Switching

被引:9
|
作者
Meneses, Marco [1 ]
Nascimento, Edgar [2 ]
Macedo, Leonardo H. [1 ]
Romero, Ruben [1 ]
机构
[1] Sao Paulo State Univ, Dept Elect Engn, BR-15385000 Ilha Solteira, Brazil
[2] Fed Inst Educ Sci & Technol Mato Grosso, BR-78050000 Cuiaba, Brazil
基金
巴西圣保罗研究基金会;
关键词
Disjunctive model; mixed-integer linear programming; network planning; transmission switching; REACTIVE POWER; FRAMEWORK; SYSTEMS; SOLVE; MODEL;
D O I
10.1109/ACCESS.2020.3003973
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Commonly, in the transmission network expansion planning (TNEP) problem, the objective is to define the minimal-cost investment in new transmission devices, e.g., the transmission lines and transformers, for the system to operate adequately in a planning horizon. In addition to the traditional approach of considering the installation of new components, the presented model considers the enhancement of the system operation performance through the modification of its topology in each operation scenario. This modification is made by switching off the lines that degrade the system's performance. By using an illustrative example, we discuss why congestion is eliminated by switching off specific lines from the system, thereby improving the performance of the existing network and constructed candidate lines and leading to lower investment costs. The proposed method also considers a strategy to reduce the number of lines switched off in order to improve the reliability of the system and avoid alternative optimal solutions with unnecessary lines switched. The tests are carried out using the 46-bus southern Brazilian system and the IEEE 24-bus system, which are usually used as benchmarks for the TNEP problem. The results are compared with the solutions of the traditional model for TNEP to show the efficiency of the proposed approach.
引用
收藏
页码:115148 / 115158
页数:11
相关论文
共 50 条
  • [1] Transmission Network Expansion Planning Considering Transmission Switching and Pumped-Storage
    Rathore, Chandrakant
    Thote, Pankaj B.
    Kamble, Saurabh
    Naik, Vishant
    Singh, Puneet
    Jukaria, Mukta
    [J]. 2017 IEEE INTERNATIONAL WIE CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (IEEE WIECON-ECE 2017), 2017, : 161 - 164
  • [2] A Genetic Algorithm for Transmission Network Expansion Planning Considering Line Maintenance
    Mahdavi, Meisam
    Kheirkhah, Ali Reza
    Macedo, Leonardo H.
    Romero, Ruben
    [J]. 2020 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2020,
  • [3] Linearized Generation-Expansion Planning Considering Transmission Planning, Switching, and Dynamic-Line Rating
    Jabarnejad, Masood
    [J]. JOURNAL OF ENERGY ENGINEERING, 2021, 147 (04)
  • [4] Multi-Year Stochastic Transmission Network Expansion Planning Considering Line Uprating
    Alvarez, Ricardo
    Rahmann, Claudia
    Cifuentes, Nicolas
    Palma-Behnke, Rodrigo
    [J]. IEEE ACCESS, 2021, 9 : 33075 - 33090
  • [5] Transmission network expansion planning considering uncertainness in demand
    Silva, ID
    Rider, MJ
    Romero, R
    Murari, CA
    [J]. 2005 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS, 1-3, 2005, : 1424 - 1429
  • [6] AC transmission network expansion planning considering losses
    Morquecho, Edgar G.
    Torres, Santiago P.
    Espinoza, Juan L.
    Lopez, Julio C.
    Quizhpe, Klever L.
    Sempertegui, Rodrigo E.
    Solano, Lizandro D.
    [J]. 2018 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE (ISGT-EUROPE), 2018,
  • [7] Transmission network expansion planning considering repowering and reconfiguration
    Tejada, Diego
    Lopez-Lezama, Jesus M.
    Rider, Marcos J.
    Vinasco, Guillermo
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2015, 69 : 213 - 221
  • [8] Transmission Network Expansion Planning Considering Disjoint Control
    Xiao, Chufei
    Tang, Fei
    Liu, Dichen
    Zhao, Hongsheng
    Zhao, Xiongguang
    Liang, Weiqiang
    Jian, Wen
    Qing, Mengqi
    Qing, Mengjiao
    [J]. Dianwang Jishu/Power System Technology, 2020, 44 (06): : 2204 - 2213
  • [9] Transmission network expansion planning considering uncertainty in demand
    Silva, Irenio de J.
    Rider, Marcos J.
    Romero, Ruben
    Murari, Carlos A. F.
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (04) : 1565 - 1573
  • [10] Probabilistic transmission expansion planning considering risk of cascading transmission line failures
    Karimi, Ebrahim
    Ebrahimi, Akbar
    [J]. INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2015, 25 (10): : 2547 - 2561