Geostatistical Algorithm Selection for Mineral Resources Assessment and its Impact on Open-pit Production Planning Considering Metal Grade Boundary Effect

被引:9
|
作者
Maleki, Mohammad [1 ]
Madani, Nasser [2 ]
Jelvez, Enrique [3 ,4 ]
机构
[1] Univ Catolica Norte, Dept Met & Min Engn, Antofagasta, Chile
[2] Nazarbayev Univ, Sch Min & Geosci, Nur Sultan City, Kazakhstan
[3] Univ Chile, Dept Min Engn, Delphos Mine Planning Lab, Santiago, Chile
[4] Univ Chile, Adv Min Technol Ctr, Santiago, Chile
关键词
Mine planning; Geostatistical simulation; Joint simulation; Cascade approach; PRODUCTION SCHEDULING PROBLEM; SIMULATION; PROGRAM; OPTIMIZATION; UNCERTAINTY; POINT;
D O I
10.1007/s11053-021-09928-z
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Mine planning is influenced by many sources of uncertainty. Significant sources of geological uncertainty in mine planning include uncertainty in layout of geological domains and uncertainty in metal grades. These two sources of uncertainty cannot be modeled separately because the distribution of the grade is controlled usually by geological domains. Two approaches exist for combining these two sources of uncertainty: the joint simulation approach and the cascade approach. In this paper, these two approaches were compared using a real case study. To this end, uncertainty in iron grade (quantitative variable) and ore zones (qualitative variable) was modeled using both approaches. There were some considerable differences in the results obtained by each approach, which confirm the importance of choosing the most appropriate approach with consideration of the dominate features of a deposit.
引用
收藏
页码:4079 / 4094
页数:16
相关论文
共 2 条
  • [1] Geostatistical Algorithm Selection for Mineral Resources Assessment and its Impact on Open-pit Production Planning Considering Metal Grade Boundary Effect
    Mohammad Maleki
    Nasser Madani
    Enrique Jélvez
    [J]. Natural Resources Research, 2021, 30 : 4079 - 4094
  • [2] Block size selection and its impact on open-pit design and mine planning
    Jara, RM
    Couble, A
    Emery, X
    Magri, EJ
    Ortiz, JM
    [J]. JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2006, 106 (03): : 205 - 211