Will knowledge infrastructure capabilities elevate the project management maturity? An empirical study

被引:3
|
作者
Alghail, Adnan [1 ]
Yao, Liu [2 ]
Abbas, Mohammed [3 ]
机构
[1] Greece Cent Sch Dist, Dept World Languages, Rochester, NY 14615 USA
[2] Huaiyin Inst Technol, Fac Management Engn, Huaian, Peoples R China
[3] Anadolu Univ, Fac Econ & Adm Sci, Eskisehir, Turkey
关键词
Project management; Knowledge management; Project management maturity; Knowledge infrastructure capabilities; higher education institutions (HEIs); PERFORMANCE; MODELS;
D O I
10.1108/VJIKMS-12-2021-0289
中图分类号
G25 [图书馆学、图书馆事业]; G35 [情报学、情报工作];
学科分类号
1205 ; 120501 ;
摘要
Purpose The factors for higher education institutions' (HEIs) project management failure have been studied for several years. One of the issues is a lack of tools to combine their knowledge infrastructure capabilities (KIC) with project management (PM) to examine these infrastructures and monitor maturity. There are several project management maturity (PMM) models available. However, there are just a few empirical studies that support the three knowledge infrastructure capabilities and PMM integrations. As a result, the current research aims to suggest a new conceptual model, KIC-knowledge management (KM), and assess a research model that includes the three knowledge infrastructure capabilities as a prerequisite to elevate the PMM. Design/methodology/approach Partial least squares structural equation modeling (PLS-SEM) is used to evaluate the proposed research model. The study's hypotheses were also examined using a sample of 352 respondents from PM departments at ten Yemeni public universities. Findings The study found that if the three key knowledge infrastructure capabilities integrate into the PMs, then it will help HEIs to perform project tasks more effectively and efficiently. Also, it will improve the PM maturity level if all the three capabilities positively effect PMM. Research limitations/implications The study findings cannot be generalized to other industries because the collected date were with the Yemeni public universities' context. Also, the new proposed model can be assessed in various sectors to increase the validity of the model. One more thing, future academics can conduct qualitative research study to validate again the proposed model. Practical implications Project managers can develop and improve their organization's effectiveness and performance by focusing on these findings and using the developed model. Also, the findings of this study can be used as a benchmark for evaluating initiatives and knowledge-based governmental entities. Social implications It is an opportunity for knowledge-based governmental entities particularly and other organizations to elevate most of projects to achieve a supreme level of maturity. Also, this study will assist employees to understand the relationship between KICs and projects within HEIs in Yemen. Originality/value This paper is among the first to empirically study the impact of the three knowledge infrastructure capabilities toward PMM. It links between two important domains: KM and PM.
引用
收藏
页码:782 / 803
页数:22
相关论文
共 50 条
  • [1] Assessment of knowledge process capabilities toward project management maturity: an empirical study
    Alghail, Adnan
    Yao, Liu
    Abbas, Mohammed
    Baashar, Yahia
    [J]. JOURNAL OF KNOWLEDGE MANAGEMENT, 2022, 26 (05) : 1207 - 1234
  • [2] THE RELATIONSHIP BETWEEN PROJECT MANAGEMENT OFFICE MATURITY AND ORGANISATIONAL PROJECT MANAGEMENT MATURITY: AN EMPIRICAL STUDY OF THE SOUTH AFRICAN GOVERNMENT INFRASTRUCTURE DEPARTMENTS
    Khalema, L. S.
    van Waveren, C. C.
    Chan, K-Y.
    [J]. SOUTH AFRICAN JOURNAL OF INDUSTRIAL ENGINEERING, 2015, 26 (03): : 12 - 26
  • [3] Role of knowledge infrastructure capabilities in knowledge management
    Pandey, Satyendra C.
    Dutta, Andrew
    [J]. JOURNAL OF KNOWLEDGE MANAGEMENT, 2013, 17 (03) : 435 - 453
  • [4] An empirical study on capabilities, activities, and performance of knowledge management
    Lee, Young-Chan
    Joo, Jae-Hun
    [J]. WMSCI 2005: 9TH WORLD MULTI-CONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL 10, 2005, : 147 - 152
  • [5] Project management maturity: An assessment of project management capabilities among and between selected industries
    Grant, KP
    Pennypacker, JS
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2006, 53 (01) : 59 - 68
  • [6] Project Management Knowledge and Effects on Construction Project Outcomes: An Empirical Study
    Chou, Jui-Sheng
    Yang, Jung-Ghun
    [J]. PROJECT MANAGEMENT JOURNAL, 2012, 43 (05) : 47 - 67
  • [7] Empirical Study of Knowledge Management Influence on SMEs Dynamic Capabilities Promotion
    Lu Qi-Cheng
    Wu Yong-Jie
    [J]. PROCEEDINGS OF THE 2016 INTERNATIONAL SYMPOSIUM ON BUSINESS COOPERATION AND DEVELOPMENT, 2016, 13 : 149 - 152
  • [8] Knowledge management capabilities & infrastructure for e-commerce
    Bose, R
    [J]. JOURNAL OF COMPUTER INFORMATION SYSTEMS, 2002, 42 (05) : 40 - 49
  • [9] Increasing Knowledge Management Maturity in Organisations: A Capabilities - Driven Model
    Ngosi, Theodora
    Helfert, Markus
    Braganza, Ashley
    [J]. PROCEEDINGS OF THE 3RD EUROPEAN CONFERENCE ON INTELLECTUAL CAPITAL, 2011, : 302 - 312
  • [10] Assessment of Portfolio Management Capabilities Based on Organizational Project Management Maturity Model
    Li, Suike
    Bai, Sijun
    Guo, Yuntao
    Feng, Rong
    [J]. EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2097 - 2101