Efficient BIM for planning infrastructure projects

被引:5
|
作者
Breitenberger, Michael [1 ]
Kreutz, Johannes [2 ]
Braml, Thomas [3 ]
机构
[1] BiM CC GmbH, Friedrich Fischer Str 12, D-85435 Erding, Germany
[2] BiM CC GmbH, GmbH Khoch3, Ringstr 39, D-85764 Oberschleissheim, Germany
[3] BiM CC GmbH, HFR Ingenieure GmbH, Grunwalderstr 1, D-81594 Munich, Germany
关键词
DESIGN;
D O I
10.1002/best.201700059
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A new concept called AgilesBIM(2) is presented. It stands for Agile Building Information Modeling Management and can be used efficiently for planning bridges based on BIM. The concept is very flexible and is focused on the automatize CAD-processes. It can be used for large and highly complex geometries. The presented concept is used within the software Siemens NX, which is well suited for this purpose. The publication deals beside the introduction of the concept with working planning for bridges in general, ensure quality for BIM models, geometrical tolerances, data exchange and the linking BIM-models to full models for static computations. It is successfully tested within several projects. One of these projects is the viaduct of Pleichach, which is currently build by the company Max Bogl.
引用
收藏
页码:68 / 76
页数:9
相关论文
共 50 条
  • [1] BIM for Infrastructure Projects
    不详
    [J]. BAUINGENIEUR, 2013, 88 : A4 - A4
  • [2] BIM APPLICATION IN INFRASTRUCTURE PROJECTS
    Vilutiene, Tatjana
    Sarkiene, Edita
    Sarka, Vaidotas
    Kiaulakis, Arvydas
    [J]. BALTIC JOURNAL OF ROAD AND BRIDGE ENGINEERING, 2020, 15 (03): : 74 - 92
  • [3] BIM in Construction and Maintenance of Infrastructure Projects
    Alasskar, Albaraa
    Jagannathan, P.
    [J]. ADVANCES IN CONSTRUCTION MANAGEMENT, ACMM 2021, 2022, 191 : 481 - 499
  • [4] BIM in planning deconstruction projects
    Galic, M.
    Dolacek-Alduk, Z.
    Cerovecki, A.
    Glick, D.
    Abramovic, M.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION 2014, 2015, : 81 - 85
  • [5] BIM cost analysis of transport infrastructure projects
    Volkov, Andrey
    Chelyshkov, Pavel
    Grossman, Y.
    Khromenkova, A.
    [J]. ENERGY MANAGEMENT OF MUNICIPAL TRANSPORTATION FACILITIES AND TRANSPORT (EMMFT 2017), 2017, 90
  • [6] Planning and design of large infrastructure projects
    Priemus, Hugo
    Flyvbjerg, Bent
    [J]. ENVIRONMENT AND PLANNING B-PLANNING & DESIGN, 2007, 34 (04): : 576 - 577
  • [7] Policy and Planning for Large Infrastructure Projects
    Flyvbjerg, Bent
    [J]. EKONOMICHESKAYA POLITIKA, 2006, (01): : 77 - 101
  • [8] The BIM methodology in the development of structure and infrastructure projects in IDOM
    La metodología BIM en la elaboración de proyectos de estructuras e infraestructuras en ldom
    [J]. 2018, Colegio de Ingenieros de Caminos Canales y Puertos (165):
  • [9] New Perspectives for BIM Usage in Transportation Infrastructure Projects
    Moreno Bazan, Angela
    Alberti, Marcos G.
    Arcos Alvarez, Antonio
    Trigueros, Jesus Alonso
    [J]. APPLIED SCIENCES-BASEL, 2020, 10 (20): : 1 - 22
  • [10] Dynamic Modeling of Workforce Planning for Infrastructure Projects
    Sing, Michael C. P.
    Love, P. E. D.
    Edwards, D. J.
    Liu, Junxiao
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (06)