Study on Time Factors in the Smoke Control Process of Highway Tunnel Fires

被引:1
|
作者
Zheng, Guoping [1 ,2 ]
Xue, Dapeng [2 ]
Zhuang, Yizhou [1 ]
Zhu, Yusheng [2 ]
机构
[1] Zhejiang Univ Technol, Coll Civil Engn & Architecture, Hangzhou 310014, Peoples R China
[2] Shaoxing Univ, Coll Civil Engn, Shaoxing 312000, Peoples R China
基金
中国国家自然科学基金;
关键词
ROAD TUNNEL; SIMULATION; VENTILATION; SYSTEM; FLAME;
D O I
10.1155/2021/6670559
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Fire is the most deadly risk during tunnel operation. Early rapid response and a reasonable smoke control plan are very important to evaluate tunnel fire performance. In order to study the relevant time factors for smoke management in a highway tunnel, firstly, the logical sequence and time of the fire alarm system (FAS) startup are investigated and analyzed. Then, according to the one-dimensional fluid mechanics model, the time rule of adjusting the airflow field in the tunnel from the normal operation stage to the emergency ventilation state is analyzed theoretically. Finally, the abovementioned theoretical formulas are verified through the employment of model experiments. The analysis shows that the time that passes from the start of the fire to when the exhaust fan is activated is close to 3 minutes. The time required to form a stable critical wind speed, however, is close to 7 minutes, which is longer than the 5 minutes it takes for the fire to reach its maximum temperature. Due to inertia, it takes about 0.5 to 2 minutes for the air velocity in tunnels of different lengths to drop from the traffic piston wind speed to the critical wind speed. If reverse smoke extraction is required, however, the duration is between 3 and 8 minutes. The conclusion is of guiding significance for the preparation of the emergency linkage control scheme for tunnels, as well as for the setting of initial boundary conditions for CFD fire simulations.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] Control of smoke flow in tunnel fires
    Oka, Y
    Atkinson, GT
    FIRE SAFETY JOURNAL, 1995, 25 (04) : 305 - 322
  • [2] Smoke Control in Subway Tunnel Fires
    Zha, Xiaoxiong
    Zeng, Sheng
    Chen, Yiyan
    Jiang, Ruijuan
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING III, PT 1, 2014, 638-640 : 2027 - +
  • [3] A study of the effect of tunnel aspect ratio on control of smoke flow in tunnel fires
    Wu, Y
    Bakar, MZA
    Atkinson, GT
    Jagger, S
    9TH INTERNATIONAL CONFERENCE ON AERODYNAMICS AND VENTILATION OF VEHICLE TUNNELS: DEVELOPMENTS FOR THE 21ST CENTURY, 1997, (27): : 573 - 587
  • [4] Estimation of smoke arrival time in tunnel fires
    Li, Liming
    Cheng, Xudong
    Cui, Yu
    Dong, Wenhui
    Mei, Zhibin
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 38 : 431 - 434
  • [5] Numerical Study on Smoke Control in Urban Traffic Link Tunnel Fires
    Hua Gaoying
    Wang Wei
    Zhao Yaohua
    Li Lei
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL VII, PTS A AND B, 2008, 7 : 820 - 827
  • [6] Influence of upstream blockage on smoke control in tunnel fires
    Li, Ying Zhen
    Ingason, Haukur
    FIRE SAFETY JOURNAL, 2024, 147
  • [7] Numerical Study of Smoke Flow Control in Tunnel Fires Using Ventilation Systems
    Banjac, Milos
    Nikolic, Barbara
    FME TRANSACTIONS, 2008, 36 (04): : 145 - 150
  • [8] Numerical study of the characteristics of smoke spread in tunnel fires during construction and method for improvement of smoke control
    Yao, Yongzheng
    Wang, Rui
    Xia, Ziyang
    Ren, Fei
    Zhao, Jinlong
    Zhu, Hongqing
    Cheng, Xudong
    CASE STUDIES IN THERMAL ENGINEERING, 2022, 34
  • [9] CFD Analysis of Smoke Extraction in High-Altitude Highway Tunnel Fires with Vertical Shafts
    Jin, Xiaohua
    Lin, Zhihao
    Hua, Shunheng
    Tong, Xinru
    Zhang, Lingbo
    Gong, Jiankun
    Mu, Zhenzhen
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2024, 31 (06): : 1987 - 1994
  • [10] SMOKE CHARACTERISTICS OF TUNNEL WOOD FIRES
    LEE, CK
    SINGER, JM
    CASHDOLLAR, KL
    FIRE AND MATERIALS, 1978, 2 (03) : 110 - 116