A tabu search heuristic for scheduling the production processes at an oil refinery

被引:8
|
作者
Persson, JA [1 ]
Göthe-Lundgren, M
Lundgren, JT
Gendron, B
机构
[1] Blekinge Inst Technol, Dept Software Engn & Comp Sci, Ronneby, Sweden
[2] Linkoping Univ, Dept Math, S-58183 Linkoping, Sweden
[3] Linkoping Univ, Dept Sci & Technol, S-58183 Linkoping, Sweden
[4] Univ Montreal, Ctr Rech Transports, Quebec City, PQ, Canada
关键词
D O I
10.1080/00207540310001613656
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we present a tabu search heuristic which can be used for scheduling the production at an oil refinery. The scheduling problem is to decide which production modes to use at the different processing units at each point in time. The problem is a type of lot-sizing problem where costs of changeovers, inventories and production are considered. In the suggested tabu search heuristic we explore the use of variable neighbourhood, dynamic penalty and different tabu lists. Computational results are presented for different versions of the heuristic and the results are compared to the best-known lower bound for a set of scheduling scenarios.
引用
收藏
页码:445 / 471
页数:27
相关论文
共 50 条
  • [1] Production Scheduling based on Tabu and Scatter Search Techniques with an Heuristic Approach
    Savino, Matteo Mario
    [J]. 2008 10TH INTERNATIONAL CONFERENCE ON CONTROL AUTOMATION ROBOTICS & VISION: ICARV 2008, VOLS 1-4, 2008, : 934 - 938
  • [2] A tabu search heuristic for ship routing and scheduling
    Korsvik, J. E.
    Fagerholt, K.
    Laporte, G.
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2010, 61 (04) : 594 - 603
  • [3] A tabu search heuristic for preventive maintenance scheduling
    Gopalakrishnan, M
    Mohan, S
    He, Z
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2001, 40 (1-2) : 149 - 160
  • [4] A tabu search heuristic for the quay crane scheduling problem
    Sammarra, Marcello
    Cordeau, Jean-Francois
    Laporte, Gilbert
    Monaco, M. Flavia
    [J]. JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 327 - 336
  • [5] A tabu search heuristic for the quay crane scheduling problem
    Marcello Sammarra
    Jean-François Cordeau
    Gilbert Laporte
    M. Flavia Monaco
    [J]. Journal of Scheduling, 2007, 10 : 327 - 336
  • [6] A neuro-tabu search heuristic for the flow shop scheduling problem
    Solimanpur, M
    Vrat, P
    Shankar, R
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (13) : 2151 - 2164
  • [7] A tabu search heuristic for ship routing and scheduling with flexible cargo quantities
    Korsvik, Jarl Eirik
    Fagerholt, Kjetil
    [J]. JOURNAL OF HEURISTICS, 2010, 16 (02) : 117 - 137
  • [8] A Modelling and Tabu Search Heuristic for a Continuous Galvanizing Line Scheduling Problem
    Tang, Lixin
    Gao, Cong
    [J]. ISIJ INTERNATIONAL, 2009, 49 (03) : 375 - 384
  • [9] A tabu search heuristic for ship routing and scheduling with flexible cargo quantities
    Jarl Eirik Korsvik
    Kjetil Fagerholt
    [J]. Journal of Heuristics, 2010, 16 : 117 - 137
  • [10] A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers
    Wang, Xianpeng
    Tang, Lixin
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (03) : 907 - 918