Sources of uncertainty in estimating suspended sediment load

被引:0
|
作者
Smith, Celina [1 ]
Croke, Barry [1 ]
机构
[1] Australian Natl Univ, Ctr Resource & Environm Studies, Canberra, ACT 0200, Australia
来源
Sediment Budgets 2 | 2005年 / 292卷
关键词
Murrumbidgee River catchment; Australia; suspended sediment; uncertainty;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An important task in the assessment of suspended sediment load estimates is to qualify and (where appropriate) quantify the uncertainty associated with that estimate. A sediment rating curve is a relationship between suspended sediment concentration and flow used in the calculation of a load estimate. However, this method assumes particular characteristics in the input data. It was found that historical data for the Murrumbidgee River catchment, Australia, did not possess all these assumed characteristics because of variations in suspended sediment sampling methods, a lack of metadata, and a lack of a sufficient number of samples covering the range of flow conditions. These factors inhibited the use of sediment rating curves for developing an appropriate suspended sediment load estimate and its associated uncertainty.
引用
收藏
页码:136 / 143
页数:8
相关论文
共 50 条
  • [1] ESTIMATING SUSPENDED SEDIMENT LOAD IN RESERVOIRS
    MCHENRY, JR
    RITCHIE, JC
    SCHIEBE, FR
    [J]. WATER RESOURCES BULLETIN, 1977, 13 (01): : 81 - 92
  • [2] Uncertainty estimation in fingerprinting suspended sediment sources
    Rowan, JS
    Goodwill, P
    Franks, SW
    [J]. TRACERS IN GEOMORPHOLOGY, 2000, : 279 - 290
  • [3] An application of adaptive cluster sampling for estimating total suspended sediment load
    Arabkhedri, M.
    Lai, F. S.
    Noor-Akma, I.
    Mohamad-Roslan, M. K.
    [J]. HYDROLOGY RESEARCH, 2010, 41 (01): : 63 - 73
  • [4] Analyzing the uncertainty of suspended sediment load prediction using sequential data assimilation
    Leisenring, Marc
    Moradkhani, Hamid
    [J]. JOURNAL OF HYDROLOGY, 2012, 468 : 268 - 282
  • [5] Development of the FCM-SVR Hybrid Model for Estimating the Suspended Sediment Load
    Hassanpour, Farzad
    Sharifazari, Salman
    Ahmadaali, Khaled
    Mohammadi, Sara
    Sheikhalipour, Zeinab
    [J]. KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (06) : 2514 - 2523
  • [6] Identifying a reliable method for estimating suspended sediment load in a temporary river system
    De Girolamo, A. M.
    Di Pillo, R.
    Lo Porto, A.
    Todisco, M. T.
    Barca, E.
    [J]. CATENA, 2018, 165 : 442 - 453
  • [7] Development of the FCM-SVR Hybrid Model for Estimating the Suspended Sediment Load
    Farzad Hassanpour
    Salman Sharifazari
    Khaled Ahmadaali
    Sara Mohammadi
    Zeinab Sheikhalipour
    [J]. KSCE Journal of Civil Engineering, 2019, 23 : 2514 - 2523
  • [8] Quantification of suspended load, sinks and sources for a sediment budget of the German river Rhine
    Gehres, N.
    Brandstetter, B.
    Hillebrand, G.
    Vollmer, S.
    Banhold, K.
    Frings, R. M.
    Schuettrumpf, H.
    [J]. RIVER FLOW 2014, 2014, : 967 - 973
  • [9] Estimating quantiles of annual maximum suspended sediment load in the tributaries of the Lower Mekong River
    Heng, Sokchhay
    Suetsugi, Tadashi
    [J]. JOURNAL OF WATER AND CLIMATE CHANGE, 2013, 4 (01) : 63 - 76
  • [10] UNCERTAINTY IN SUSPENDED SEDIMENT TRANSPORT CURVES
    MCBEAN, EA
    ALNASSRI, S
    [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1990, 116 (05): : 732 - 732