Realtime scheduling heuristics for just-in-time production in large-scale flexible job shops

被引:4
|
作者
Weng, Wei [1 ]
Chen, Junru [2 ]
Zheng, Meimei [3 ]
Fujimura, Shigeru [2 ]
机构
[1] Kanazawa Univ, Inst Liberal Arts & Sci, Kanazawa, Ishikawa 9201192, Japan
[2] Waseda Univ, Grad Sch Informat Prod & Syst, Wakamatsu Ku, 2-7 Hibikino, Kitakyushu, Fukuoka 8080135, Japan
[3] Shanghai Jiao Tong Univ, Sch Mech Engn, 800 Dongchuan Rd, Shanghai 200240, Peoples R China
基金
中国国家自然科学基金;
关键词
Just-in-time production; Flexible job shop; Realtime scheduling; Intelligent production; Due date setting; Dispatching rule; Industrial case study; DUE-DATE ASSIGNMENT; DISPATCHING RULES; FLOW-TIME; ALGORITHM; OPTIMIZATION; MODELS;
D O I
10.1016/j.jmsy.2022.01.006
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study aims to enable jobs to go smoothly between shops on a production line by completing jobs in the upstream shop just in time (JIT) for the downstream shop. We propose solutions to a factory that is seeking ways for an upstream shop to complete every job at the precise time such that the downstream shop can process the job. We model the upstream shop as a flexible job shop and propose four methods that form a realtime scheduling and control system for JIT production. We first propose a method to set for each job a due date by which the job should be completed in the upstream shop. The due dates are set in such a manner that jobs would be completed JIT for the downstream shop, if they are completed JIT for their due dates. We then propose a method to estimate the minimum number of workers needed in the upstream shop for completing the jobs by their due dates. We further propose two methods that work dynamically to complete each job neither too early nor too late for its due date. One is a dispatching rule that dynamically sequences jobs in process according to urgency degree. The other is a job-selecting heuristic that dynamically assigns workers to jobs such that jobs not nearing completion will be given priority in processing. Simulations by using data from the factory show that the methods can achieve in real time (i.e. within 0.00 seconds) JIT production for a flexible job shop problem involving hundreds of operations. More extensive simulations by using a large number of randomly generated problem instances show that solutions obtained in real time by the proposed methods greatly outperform those obtained in much longer time by metaheuristics designed for solving similar problems, and that each proposed method outperforms its rivals in the literature. The findings imply that integrating fast and high-performing heuristics and rules can be a solution to solve large-scale scheduling problems in real time.
引用
收藏
页码:64 / 77
页数:14
相关论文
共 50 条
  • [1] Study and Application of Scheduling Method for Just-in-time Production in Flexible Job Shops
    Weng, Wei
    Fujimura, Shigeru
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 318 - 322
  • [2] Heuristic approaches for scheduling jobs in large-scale flexible job shops
    Sobeyko, Oleh
    Moench, Lars
    COMPUTERS & OPERATIONS RESEARCH, 2016, 68 : 97 - 109
  • [3] Integrated process planning and scheduling for large-scale flexible job shops using metaheuristics
    Sobeyko, Oleh
    Moench, Lars
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (02) : 392 - 409
  • [4] LOAD-ORIENTED MANUFACTURING CONTROL JUST-IN-TIME PRODUCTION FOR JOB SHOPS
    BECHTE, W
    PRODUCTION PLANNING & CONTROL, 1994, 5 (03) : 292 - 307
  • [5] JOB SHOPS CAN USE REPETITIVE MANUFACTURING METHODS TO FACILITATE JUST-IN-TIME PRODUCTION
    DICASALI, RL
    INDUSTRIAL ENGINEERING, 1986, 18 (06): : 48 - 51
  • [6] Modified Shifting Bottleneck Heuristic for Scheduling Problems of Large-Scale Job Shops
    周炳海
    彭涛
    Journal of Donghua University(English Edition), 2016, 33 (06) : 883 - 887
  • [7] A DECOMPOSITION-BASED OPTIMIZATION ALGORITHM FOR SCHEDULING LARGE-SCALE JOB SHOPS
    Zhang, Rui
    Wu, Cheng
    INTERNATIONAL JOURNAL OF INNOVATIVE COMPUTING INFORMATION AND CONTROL, 2009, 5 (09): : 2769 - 2780
  • [8] A prediction based iterative decomposition algorithm for scheduling large-scale job shops
    Liu, Min
    Hao, Jing-Hua
    Wu, Cheng
    MATHEMATICAL AND COMPUTER MODELLING, 2008, 47 (3-4) : 411 - 421
  • [9] A Large-Scale Empirical Study of Just-in-Time Quality Assurance
    Kamei, Yasutaka
    Shihab, Emad
    Adams, Bram
    Hassan, Ahmed E.
    Mockus, Audris
    Sinha, Anand
    Ubayashi, Naoyasu
    IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 2013, 39 (06) : 757 - 773
  • [10] Research of Just-in-time Scheduling for Assembly Job Shop
    Lü H.
    Zhu J.
    Wang Z.
    Wu S.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2021, 57 (05): : 157 - 165