Learning and process improvement during production ramp-up

被引:224
|
作者
Terwiesch, C [1 ]
Bohn, RE [1 ]
机构
[1] Univ Penn, Wharton Sch, Dept Operat & Informat Management, Philadelphia, PA 19104 USA
关键词
yield; ramp-up; start-up; learning curve; experimentation;
D O I
10.1016/S0925-5273(00)00045-1
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Rapid product lifecycles and high development costs pressure manufacturing firms to cut not only their development times (time-to-market), but also the time to reach full capacity utilization (time-to-volume). The period between completion of development and full capacity utilization is known as production ramp-up. During that time, the new production process is ill understood, which causes low yields and low production rates, This paper analyzes the interactions among capacity utilization, yields, and process improvement (learning). We model learning in the form of deliberate experiments, which reduce capacity in the short run. This creates a trade-off between experiments and production. High selling prices during ramp-up raise the opportunity cost of experiments, yet early learning is more valuable than later learning. We formalize the resulting intertemporal trade-off between the short-term opportunity cost of capacity and the long term value of learning as a dynamic program. The paper also examines the tradeoff between production speed and yield/quality, where faster production rates lead to more defects. Finally, we show what happens if managers misunderstand the sources of learning. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:1 / 19
页数:19
相关论文
共 50 条
  • [1] Production quality improvement during manufacturing systems ramp-up
    Colledani, M.
    Tolio, T.
    Yemane, A.
    [J]. CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2018, 23 : 197 - 206
  • [2] Production planning for a ramp-up process with learning in production and growth in demand
    Glock, Christoph H.
    Jaber, Mohamad Y.
    Zolfaghari, Saeed
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (20) : 5707 - 5718
  • [3] Yield Improvement Methodology with addressing Design Systematics during Production Ramp-up
    Yin, Jianhua
    Chen, Ian
    Chokanathan, Rakesh
    Gyawali, Suraj
    Du, Yuchen
    Wang, Yuansong
    Liu, Xue Mei
    Lim, C. T.
    Gao, Wen Zhi
    [J]. 2022 33RD ANNUAL SEMI ADVANCED SEMICONDUCTOR MANUFACTURING CONFERENCE (ASMC), 2022,
  • [4] A new framework to evaluate the process capability of production technologies during production ramp-up
    Stauder, Jens
    Buchholz, Steffen
    Klocke, Fritz
    Mattfeld, Patrick
    [J]. 2ND ICRM 2014 INTERNATIONAL CONFERENCE ON RAMP-UP MANAGEMENT, 2014, 20 : 126 - 131
  • [5] Sustainability in Production Ramp-up
    Padrón, Marcos
    Beckschulte, Sebastian
    Haller, Julian
    Elsner, Juliane
    Schmitt, Robert H.
    [J]. ZWF Zeitschrift fuer Wirtschaftlichen Fabrikbetrieb, 2023, 118 (1-2): : 15 - 19
  • [6] Cycle time management during production ramp-up
    Haller, M
    Peikert, A
    Thoma, J
    [J]. ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2003, 19 (1-2) : 183 - 188
  • [7] Interface modeling and analysis during production ramp-up
    Surbier, L.
    Alpan, G.
    Blanco, E.
    [J]. CIRP JOURNAL OF MANUFACTURING SCIENCE AND TECHNOLOGY, 2010, 2 (04) : 247 - 254
  • [8] SMART ramp-up: methods to secure production ramp-up in the aircraft industry
    C. F. von Gleich
    A. Schütt
    R. Isenberg
    [J]. CEAS Aeronautical Journal, 2012, 3 (2-4) : 125 - 134
  • [9] Simulation of personnel requirements during production ramp-up
    Lanza, Gisela
    Sauer, Anna
    [J]. PRODUCTION ENGINEERING-RESEARCH AND DEVELOPMENT, 2012, 6 (4-5): : 395 - 402
  • [10] Yield improvement and ramp-up to production of advanced CMOS technologies interconnects
    Gonella, Roberto
    [J]. 2011 IEEE INTERNATIONAL INTERCONNECT TECHNOLOGY CONFERENCE AND MATERIALS FOR ADVANCED METALLIZATION (IITC/MAM), 2011,