Optimal two-threshold replacement policy in a cumulative damage model

被引:6
|
作者
Sheu, Shey-Huei [1 ,2 ]
Liu, Tzu-Hsin [1 ]
Zhang, Zhe-George [3 ,4 ]
Tsai, Hsin-Nan [1 ]
Chen, Jung-Chih [5 ]
机构
[1] Providence Univ, Dept Stat & Informat Sci, Taichung 433, Taiwan
[2] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
[3] Western Washington Univ, Dept Decis Sci, Bellingham, WA 98225 USA
[4] Simon Fraser Univ, Beedie Sch Business, Burnaby, BC V5A 1S6, Canada
[5] Natl Chiayi Univ, Dept Appl Math, Chiayi 600, Taiwan
关键词
Cumulative damage model; Optimization; Shock model; Replacement policy; DETERMINING OPTIMAL NUMBER; MINIMAL REPAIR; 2-UNIT SYSTEM; PERIODIC REPLACEMENT; MAINTENANCE POLICY; SUBJECT; DISTRIBUTIONS; SHOCKS; LAST;
D O I
10.1007/s10479-016-2142-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, a two-unit system with failure interactions is studied. The system is subject to two types of shocks (I and II) and the probabilities of these two shock types are age-dependent. A type I shock, rectified by a minimal repair, causes a minor failure of unit A and type II shock causes a complete system failure that calls for a replacement. Each unit A minor failure also results in an amount of damage to unit B. The damages to unit B caused by type I shocks can be accumulated to trigger a preventive replacement or a corrective replacement action. Besides, unit B with cumulative damage of level z may become minor failed with probability at each unit A minor failure and rectified by a minimal repair. We consider a more general replacement policy. Under this policy, the system is preventively replaced at the Nth type I shock, or at the time when the total damage to unit B exceeds a pre-specified level Z (but less than a failure level K where ) or is replaced correctively at first type II shock or when the total damage to unit B exceeding a failure level K, whichever occurs first. To minimize the expected cost per unit time, the optimal replacement policy , is derived analytically and determined numerically. We also show that several previous maintenance models in the literature are special cases of our model.
引用
收藏
页码:23 / 47
页数:25
相关论文
共 50 条
  • [1] Optimal two-threshold replacement policy in a cumulative damage model
    Shey-Huei Sheu
    Tzu-Hsin Liu
    Zhe-George Zhang
    Hsin-Nan Tsai
    Jung-Chih Chen
    [J]. Annals of Operations Research, 2016, 244 : 23 - 47
  • [2] Optimal replacement policy for a cumulative damage model with time deterioration
    Satow, T
    Teramoto, K
    Nakagawa, T
    [J]. MATHEMATICAL AND COMPUTER MODELLING, 2000, 31 (10-12) : 313 - 319
  • [3] Activate or sleep? An optimal two-threshold policy for transmission service
    Fan, Jiaqi
    Yang, Jiankui
    Yao, Dacheng
    [J]. COMPUTER COMMUNICATIONS, 2024, 217 : 152 - 165
  • [4] Global dynamics of an epidemic model with a two-threshold policy
    Zhang, Yue
    Zu, Jian
    Sun, Xiaodan
    [J]. APPLIED MATHEMATICAL MODELLING, 2024, 130 : 514 - 535
  • [5] Optimal Replacement Policy based on cumulative damage for a Two-unit System
    Sheu, Shey-Huei
    Zhang, Zhe-George
    Liu, Tzu-Hsin
    Tsai, Hsin-Nan
    [J]. 2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [6] A bivariate optimal replacement policy with cumulative repair cost limit under cumulative damage model
    Lai, Min-Tsai
    Chen, Shih-Chih
    [J]. SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2016, 41 (05): : 497 - 505
  • [7] A bivariate optimal replacement policy with cumulative repair cost limit under cumulative damage model
    Min-Tsai Lai
    Shih-Chih Chen
    [J]. Sādhanā, 2016, 41 : 497 - 505
  • [8] Optimal replacement policy under cumulative damage model and strength degradation with applications
    Phalguni Nanda
    Prajamitra Bhuyan
    Anup Dewanji
    [J]. Annals of Operations Research, 2022, 315 : 1345 - 1371
  • [9] Optimal replacement policy under cumulative damage model and strength degradation with applications
    Nanda, Phalguni
    Bhuyan, Prajamitra
    Dewanji, Anup
    [J]. ANNALS OF OPERATIONS RESEARCH, 2022, 315 (02) : 1345 - 1371
  • [10] Optimal replacement policy with replacement last under cumulative damage models
    Sheu, Shey-Huei
    Liu, Tzu-Hsin
    Sheu, Wei-Teng
    Zhang, Zhe-George
    Ke, Jau-Chuan
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2021, 209