A NSGA-II and NSGA-III comparison for solving an open shop scheduling problem with resource constraints

被引:89
|
作者
Ciro, Guillermo Campos [1 ]
Dugardin, Frederic [1 ]
Yalaoui, Farouk [1 ]
Kelly, Russell [2 ]
机构
[1] Univ Technol Troyes, ICD LOSI, UMR 6281, 12 Rue Marie Curie,CS42060, F-10004 Troyes, France
[2] Norelem SAS, 5 Rue Libellules, F-10280 Fontaine Les Gres, France
来源
IFAC PAPERSONLINE | 2016年 / 49卷 / 12期
关键词
multi-objective; scheduling algorithms; operation research; resource allocation; skills; ALGORITHM;
D O I
10.1016/j.ifacol.2016.07.690
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents an open shop scheduling problem based on a real mechanical workshop made of m, machines that process n jobs. It deals with different resource constraints related to the tools allocation and the multi skills staff assignment. Resource skills and their availability are required to execute one process task. In this work, we expose a multi objective problem where the idea is to minimize three objectives simultaneously. The first one Considers the minimization of the total flow time of jobs in the production system, then the workload balancing concerning both, humans and machines is addressed. Vie propose and compare two multi-objective methods: NSGA-II and NSGA-III. Computational experiments are designed according to the literature, we expose the small and large sized instances to present the general performance of these algorithms using the hyper-volume metric to compare them. (C) 2016, IFAC (International Federation of Automatic Control) Hosting by Elsevier Ltd. All rights reserved.
引用
收藏
页码:1272 / 1277
页数:6
相关论文
共 50 条
  • [1] Performance Comparison of NSGA-II and NSGA-III on Bi-objective Job Shop Scheduling Problems
    dos Santos, Francisco
    Costa, Lino A.
    Varela, Leonilde
    [J]. OPTIMIZATION, LEARNING ALGORITHMS AND APPLICATIONS, PT I, OL2A 2023, 2024, 1981 : 531 - 543
  • [2] On NSGA-II and NSGA-III in Portfolio Management
    Awad, Mahmoud
    Abouhawwash, Mohamed
    Agiza, H. N.
    [J]. INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2022, 32 (03): : 1893 - 1904
  • [3] Comparison of NSGA-III with NSGA-II for multi objective optimization of adiabatic styrene reactor
    Chaudhari, Pranava
    Thakur, Amit K.
    Kumar, Rahul
    Banerjee, Nilanjana
    Kumar, Amit
    [J]. MATERIALS TODAY-PROCEEDINGS, 2022, 57 : 1509 - 1514
  • [4] NSGA-III for solving dynamic flexible job shop scheduling problem considering deterioration effect
    Wu, Xiuli
    Li, Jing
    Shen, Xianli
    Zhao, Ning
    [J]. IET COLLABORATIVE INTELLIGENT MANUFACTURING, 2020, 2 (01) : 22 - 33
  • [5] Performance Comparison of NSGA-II and NSGA-III on Various Many-Objective Test Problems
    Ishibuchi, Hisao
    Imada, Ryo
    Setoguchi, Yu
    Nojima, Yusuke
    [J]. 2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 3045 - 3052
  • [6] A Comparative Analysis of NSGA-II and NSGA-III for Autoscaling Parameter Sweep Experiments in the Cloud
    Yannibelli, Virginia
    Pacini, Elina
    Monge, David
    Mateos, Cristian
    Rodriguez, Guillermo
    [J]. SCIENTIFIC PROGRAMMING, 2020, 2020
  • [7] Modified Multi-Crossover Operator NSGA-III for Solving Low Carbon Flexible Job Shop Scheduling Problem
    Sun, Xingping
    Wang, Ye
    Kang, Hongwei
    Shen, Yong
    Chen, Qingyi
    Wang, Da
    [J]. PROCESSES, 2021, 9 (01) : 1 - 21
  • [8] NSGA-II variants for solving a social-conscious dual resource-constrained scheduling problem
    Akbar, Muhammad
    Irohara, Takashi
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2020, 162 (162)
  • [9] Improved NSGA-II for the job-shop multi-objective scheduling problem
    Jiang, Xiaoyun
    Li, Yi
    [J]. International Journal of Performability Engineering, 2018, 14 (05) : 891 - 898
  • [10] Applying NSGA-II for solving the Ontology Alignment Problem
    Acampora, Giovanni
    Kaymak, Uzay
    Loia, Vincenzo
    Vitiello, Autilia
    [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC 2013), 2013, : 1098 - 1103