A bus lane reservation problem in urban bus transit network

被引:0
|
作者
Wu, Peng [1 ,2 ]
Chu, Feng [2 ,3 ]
Che, Ada [1 ]
Shi, Qin [3 ]
机构
[1] Northwestern Polytech Univ, Sch Management, Xian 710072, Peoples R China
[2] Univ Evry Val dEssonne, Lab IBISC, F-91020 Evry, France
[3] Hefei Univ Technol, Sch Transportat Engn, Hefei 230009, Anhui, Peoples R China
关键词
CUT-AND-SOLVE; ALGORITHM; METHODOLOGY; PRIORITY; STRATEGY;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This work studies a new variant of lane reservation problem called a bus lane reservation problem. It aims to optimally select some road segments to be reserved for buses in a predetermined bus transit network such that bus travelers can be rapidly transited. Two realistic assumptions are made in this work: 1) the total travel time on each bus route should be completed within a given deadline; 2) a lane on a road segment can be reserved for buses only when the bus volume on it exceeds a given level. The former guarantees bus travel time in order to improve the service level of a bus transit system. The second ensures minimum bus utilization on a reserved lane. However, private vehicles are not allowed to pass the bus exclusive lanes. Such a bus lane reservation strategy causes negative traffic impact on private vehicles. The objective of the problem is to minimize the negative traffic impact of reserved lanes. For the problem, we first construct an integer linear programming model and demonstrate its complexity to be NP-hard. Then, we propose a cut-and-solve algorithm to obtain its optimal solution. The computational results on randomly generated instances show that the proposed method is more efficient than the optimization software CPLEX 12.4.
引用
收藏
页码:2864 / 2869
页数:6
相关论文
共 50 条
  • [1] A bi-objective model for bus transit network and lane reservation integrated optimization
    Wu, Peng
    Che, Ada
    Chu, Feng
    [J]. PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 533 - 538
  • [2] Planning for Bus Rapid Transit in Single Dedicated Bus Lane
    Li, Jing-Quan
    Song, Myoung Kyun
    Li, Meng
    Zhang, Wei-Bin
    [J]. TRANSPORTATION RESEARCH RECORD, 2009, (2111) : 76 - 82
  • [3] Optimal bus lane reservation with uncertain impact
    Wu, Peng
    [J]. 2018 IEEE 15TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2018,
  • [4] Using Combined Bus Rapid Transit and Buses in a Dedicated Bus Lane to Enhance Urban Transportation Sustainability
    Hoonsiri, Chinnawat
    Chiarakorn, Siriluk
    Kiattikomol, Vasin
    [J]. SUSTAINABILITY, 2021, 13 (06)
  • [5] Mixed-integer programming for a new bus-lane reservation problem
    Wu, Peng
    Chu, Feng
    Che, Ada
    [J]. 2015 IEEE 18TH INTERNATIONAL CONFERENCE ON INTELLIGENT TRANSPORTATION SYSTEMS, 2015, : 2782 - 2787
  • [6] Numerical study of urban traffic flow with dedicated bus lane and intermittent bus lane
    Zhu, H. B.
    [J]. PHYSICA A-STATISTICAL MECHANICS AND ITS APPLICATIONS, 2010, 389 (16) : 3134 - 3139
  • [7] A new bus lane on urban expressway with no-bay bus stop
    Tian, Zhao
    Jia, Limin
    [J]. INTERNATIONAL JOURNAL OF MODERN PHYSICS B, 2016, 30 (03):
  • [8] DEMAND FOR URBAN BUS TRANSIT - REPLY
    SCHMENNER, RW
    [J]. JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 1977, 11 (01) : 97 - 99
  • [9] DEMAND FOR URBAN BUS TRANSIT IN CANADA
    FRANKENA, MW
    [J]. JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 1978, 12 (03) : 280 - 303
  • [10] The Bus Rapid Transit investment problem
    Hoogervorst, Rowan
    van der Hurk, Evelien
    Schiewe, Philine
    Schoebel, Anita
    Urban, Reena
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2024, 167