Features of BIM Implementation Using Autodesk Software
被引:5
|
作者:
Vysotskiy, Alexander
论文数: 0引用数: 0
h-index: 0
机构:
St Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, RussiaSt Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, Russia
Vysotskiy, Alexander
[1
]
Makarov, Sergei
论文数: 0引用数: 0
h-index: 0
机构:
St Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, RussiaSt Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, Russia
Makarov, Sergei
[1
]
Zolotova, Julia
论文数: 0引用数: 0
h-index: 0
机构:
St Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, RussiaSt Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, Russia
Zolotova, Julia
[1
]
Tuchkevich, Eugenia
论文数: 0引用数: 0
h-index: 0
机构:
St Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, RussiaSt Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, Russia
Tuchkevich, Eugenia
[1
]
机构:
[1] St Petersburg State Polytech Univ, Politekhnicheskaya 29, St Petersburg 195251, Russia
来源:
INTERNATIONAL SCIENTIFIC CONFERENCE URBAN CIVIL ENGINEERING AND MUNICIPAL FACILITIES (SPBUCEMF-2015)
|
2015年
/
117卷
Step by step all companies are moving to BIM technology nowdays. It accelerates work and makes efforts of designers more effective. Unfortunately, it is not so easy. Aim of this article is to provide specialists that a moving to BIM technologies with required practical recommendations. (C) 2015 The Authors. Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).