A Discussion of the Impact of Judgmental Heuristics on Elicitation during Requirements Engineering

被引:0
|
作者
Burnay, Corentin [1 ,2 ]
Faulkner, Stephane [1 ,2 ]
Jureta, Ivan [1 ,3 ]
机构
[1] Univ Namur, Namur, Belgium
[2] PReCISE Res Ctr, Flowood, MS 39232 USA
[3] FNRS, Brussels, Belgium
关键词
Requirements; Elicitation; Judgmental Heuristics;
D O I
10.1109/rcis.2019.8876972
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A stakeholder decides which information to share during requirements elicitation. These decisions are made under uncertainty: stakeholders may not have precise, concrete, and complete information about their own expectations from, or about the environment of the system-to-be, they may misunderstand information which a requirements engineer gives them, and they may not have perfect knowledge about the various opportunities that the current technology may offer. Stakeholders' decision-making is therefore likely to involve the use of heuristics. Understanding if stakeholders do indeed use heuristics during requirements elicitation, and if so, then which ones, should help understand requirements elicitation better, and design methods which can stimulate positive heuristics (those which help elicit relevant requirements) and mitigate negative ones. This paper defines what an elicitation heuristic may be, and proposes a set of research questions under the form of a matrix for the theoretical and empirical study of elicitation heuristics.
引用
收藏
页码:33 / 38
页数:6
相关论文
共 50 条
  • [1] Effectiveness of elicitation techniques in distributed requirements engineering
    Lloyd, WJ
    Rosson, MB
    Arthur, JD
    IEEE JOINT INTERNATIONAL CONFERENCE ON REQUIREMENTS ENGINEERING, PROCEEDINGS, 2002, : 311 - 318
  • [2] A Systems Engineering Approach to Requirements Elicitation and Management
    Perdikoulias, Christina
    Akers, Doug
    SAE INTERNATIONAL JOURNAL OF PASSENGER CARS-MECHANICAL SYSTEMS, 2012, 5 (04): : 1285 - 1293
  • [3] Focus Group Discussion Model for Requirements Elicitation Activity
    Kasirun, Zarinah Mow
    Salim, Siti Salwah
    ICCEE 2008: PROCEEDINGS OF THE 2008 INTERNATIONAL CONFERENCE ON COMPUTER AND ELECTRICAL ENGINEERING, 2008, : 101 - 105
  • [4] An Industrial Case Study of the Impact of Domain Ignorance on the Effectiveness of Requirements Idea Generation during Requirements Elicitation
    Niknafs, Ali
    Berry, Daniel M.
    2013 21ST IEEE INTERNATIONAL REQUIREMENTS ENGINEERING CONFERENCE (RE), 2013, : 279 - 283
  • [5] Investigating the Impact of Stakeholders' Commitment on Requirements Elicitation
    Burnay, Corentin
    Jureta, Ivan J.
    Faulkner, Stephane
    INTERNATIONAL JOURNAL OF SOFTWARE ENGINEERING AND KNOWLEDGE ENGINEERING, 2015, 25 (9-10) : 1743 - 1746
  • [6] A DISCUSSION ON NEW NECESSITY-BASED METHOD FOR REQUIREMENTS LIST ELICITATION AND REQUIREMENTS CLASSIFICATION
    Brglez, Spela
    Dolsak, Bojan
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2016, 23 (04): : 1095 - 1102
  • [7] Overcoming barriers to participation during requirements elicitation
    Durugbo, Christopher
    Riedel, Johann C. K. H.
    Pawar, Kulwant S.
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2014, 66 (01) : 81 - 103
  • [8] A scenario elicitation method in cooperation with requirements engineering and chance discovery
    Kushiro, N
    Ohsawa, Y
    KNOWLEDGE-BASED INTELLIGENT INFORMATION AND ENGINEERING SYSTEMS, PT 1, PROCEEDINGS, 2005, 3681 : 518 - 525
  • [9] Requirements Elicitation in the Context of Enterprise Engineering: A Vision Driven Approach
    Caplinskas, Albertas
    INFORMATICA, 2009, 20 (03) : 343 - 368
  • [10] Integrated Engineering from Requirements Elicitation to the Plant Structure Description
    Jaeger, Tobias
    Christiansen, Lars
    Strube, Martin
    Fay, Alexander
    AT-AUTOMATISIERUNGSTECHNIK, 2013, 61 (02) : 92 - 101