STUDY ON THE SBO COPING CAPABILITY FOR QINSHAN PHASE II UNIT 3

被引:0
|
作者
Deng, Jian [1 ]
Chen, Bin [1 ]
Deng, Chunrui [1 ]
Zhang, Ming [1 ]
机构
[1] Affiliat Sci & Technol Reactor Syst Design Techno, Chengdu, Peoples R China
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
The accident in Japan on March 2011 was caused by a natural event (i.e., earthquake, and the induced tsunami) which was far more severe than the design basis for the Fukushima Dai-ichi nuclear power plant. The reactor cores of Dai-ichi unit 1 through 3 have been degraded due to the long term station blackout (SBO). Actually, a nuclear power plant is able to prevent the core damage despite the SBO event occurs, called "coping capability" or "coping time". In this paper, the SBO coping capability is assessed for Qinshan II unit 3 based on the following: 1) reactor coolant inventory, 2) condensate inventory for decay heat removal, 3) class 1E battery capacity, 4) compressed air, 5) effects of loss of ventilation, 6) containment isolation. As a result, the SBO event tree is suggested to be updated and a few vulnerabilities have been identified and some modifications are proposed.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Extending SBO coping capability: An improved auxiliary feedwater system
    Tatu, Alin
    Kim, Taewan
    PROGRESS IN NUCLEAR ENERGY, 2017, 95 : 40 - 47
  • [2] THE STUDY OF QINSHAN III PHWR THERMOSYPHONING CAPABILITY
    Sheng, Xin
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING - 2013, VOL 4, 2014,
  • [3] Design and technical study of RPV adapter weld in Qinshan phase II project
    National Key Laboratory of Reactor System Design Technology, Nuclear Power Institute of China, Chengdu 610041, China
    Hedongli Gongcheng, 2007, SUPPL. (48-52):
  • [4] Test run of ORIENT system in QINSHAN phase II
    1600, Atomic Energy Press (35):
  • [5] Study on mitigating capability of AFW system for SBO accident
    Zhang, Wang-Suo
    Cao, Xia-Xin
    Yan, Chang-Qi
    Chen, Wei
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2012, 46 (05): : 565 - 569
  • [6] Study on beyond design basis accident for Qinshan phase II NPP project
    Jiang, Guang-Ming
    Li, Mei-Fu
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 44 - 45
  • [7] Design of CRDM for Qinshan phase II NPP project
    Li, Hong-Ying
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 161 - 164
  • [8] Severe accident research for Qinshan phase II NPP project
    Shu, Rui
    Xu, Chuan
    Hedongli Gongcheng/Nuclear Power Engineering, 2003, 24 (SUPPL.): : 36 - 39
  • [9] LABORATORY MICROFUSION CAPABILITY PHASE-II STUDY
    MCALLISTER, GL
    FUSION TECHNOLOGY, 1994, 26 (03): : 745 - 752
  • [10] Design of relief tank for Qinshan Phase II nuclear power project
    Miao, Yonggang
    Hedongli Gongcheng/Nuclear Power Engineering, 1999, 20 (05): : 421 - 423