A novel continuous-time MILP approach for short-term scheduling of multipurpose pipeless batch plants

被引:0
|
作者
Ferrer-Nadal, Sergio [1 ]
Mendez, Carlos A. [2 ]
Graells, Moises [1 ]
Puigjaner, Luis [1 ]
机构
[1] Univ Politecn Cataluna, CEPIMA, Dept Chem Engn, Av Diagonal 647, E-08028 Barcelona, Spain
[2] INTEC, UNL CONICET, RA-3000 Santa Fe, Argentina
关键词
pipeless plants; batch scheduling; limiting resources; MILP model;
D O I
暂无
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This work presents an alternative MILP mathematical formulation for the short-term scheduling of pipeless batch plants based on a continuous-time representation that relies on the general precedence notion. Besides of the intrinsic characteristics of a pipeless plant, this model considers the moveable vessels as an additional resource that has to be allocated and sequenced. This fact allows proposing a strategy consisting of a sequential treatment of the resources to reduce the complexity of the problem.
引用
收藏
页码:595 / 600
页数:6
相关论文
共 50 条
  • [1] Continuous-time modeling for short-term scheduling of multipurpose pipeless plants
    Bok, JK
    Park, S
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (09) : 3652 - 3659
  • [2] A novel continuous-time MILP formulation for multipurpose batch plants. 1. Short-term scheduling
    Majozi, T
    Zhu, XX
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (25) : 5935 - 5949
  • [3] STBS: A continuous-time MILP optimization for short-term scheduling of batch plants
    Pinto, JM
    Turkay, A
    Bolio, B
    Grossmann, IE
    COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (09) : 1297 - 1308
  • [4] Continuous time formulation of short-term scheduling for pipeless batch plants
    Lee, KH
    Chung, S
    Lee, HK
    Lee, IB
    JOURNAL OF CHEMICAL ENGINEERING OF JAPAN, 2001, 34 (10) : 1267 - 1278
  • [5] New continuous-time MILP model for the short-term scheduling of multistage batch plants
    Castro, PM
    Grossmann, IE
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2005, 44 (24) : 9175 - 9190
  • [6] Continuous-time models for short-term scheduling of multipurpose batch plants: A comparative study
    Shaik, Munawar A.
    Janak, Stacy L.
    Floudas, Christodoulos A.
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2006, 45 (18) : 6190 - 6209
  • [7] An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants
    Castro, P
    Barbosa-Póvoa, APFD
    Matos, H
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (09) : 2059 - 2068
  • [8] SHORT-TERM SCHEDULING OF PIPELESS BATCH PLANTS
    PANTELIDES, CC
    REALFF, MJ
    SHAH, N
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 1995, 73 (A4): : 431 - 444
  • [9] Short-term scheduling of pipeless batch plants
    Pantelides, CC
    Realff, MJ
    Shah, N
    CHEMICAL ENGINEERING RESEARCH & DESIGN, 1997, 75 : S156 - S169
  • [10] Short-term scheduling of pipeless batch plants
    Pantelides, C.C.
    Realff, M.J.
    Shah, N.
    Chemical Engineering Research and Design, 1995, 73 (A4): : 431 - 444