A MULTISTAGE MODEL FOR DISTRIBUTION EXPANSION PLANNING WITH DISTRIBUTED GENERATION IN A DEREGULATED ELECTRICITY MARKET

被引:0
|
作者
Porkar, S. [1 ,2 ]
Abbaspour-Tehrani-Fard, A. [1 ]
Poure, P. [3 ]
Saadate, S. [2 ]
机构
[1] Sharif Univ Technol, Dept Elect Engn, Tehran, Iran
[2] Univ Nancy 1, Grp Rech Electrotech & Elect Nancy, UMR 7037, GREEN UHP, F-54506 Vandoeuvre Les Nancy, France
[3] Univ Nancy 1, LIEN, EA 3440, F-54506 Vandoeuvre Les Nancy, France
关键词
Distributed generation (DG); distribution company (DISCO); GAMS-MATLAB interface; investment payback time; microturbine; social welfare; DIRECTED GRAPH FORMULATION; NETWORK; ALLOCATION; ALGORITHM; SYSTEMS; LOSSES; IMPACT;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Distribution systems management is becoming an increasingly complicated issue due to the introduction of new technologies, new energy trading strategies and a new deregulated environment. In the new deregulated energy market and considering the incentives coming from the technical and economic fields, it is reasonable to consider Distributed Generation (DG) as a viable option for systems reinforcement in competition with voltage regulator devices, to solve the lacking electric power supply problem and meet the load growth requirements with a reasonable price as well as the system power quality problems. The problem of optimal placement and size is formulated in two stages; minimization of the total costs to find optimal sizing and mounting of DG with different payback time, and maximization of the social welfare to find optimal payback time. In this framework, the object function is investment costs, which are evaluated as the annualized total investment cost, plus total running cost as well as cost of Energy Not Supply (ENS) and losses. Different system conditions are assumed to indicate the effect of the system conditions on planning decision as well as the effect of DG placement on improvement of system conditions. An optimal placement, size and investment payback time is identified. The proposed two-stage model aspects of system operation and economic aspects of market operation act as good indicators for the placement of Microturbine as a common type of DG, especially in a market environment. A software package is developed for this reason, which runs each type of planning problem very fast. The proposed methodology is tested in the IEEE 30-bus test system.
引用
收藏
页码:275 / 287
页数:13
相关论文
共 50 条
  • [1] An approach to distribution system planning by implementing distributed generation in a deregulated electricity market
    Porkar, S.
    Fard, A. Abbaspour-Tehrani
    Saadate, S.
    [J]. 2007 LARGE ENGINEERING SYSTEMS CONFERENCE ON POWER ENGINEERING, 2007, : 89 - +
  • [2] A review on distributed generation allocation and planning in deregulated electricity market
    Singh, A. K.
    Parida, S. K.
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2018, 82 : 4132 - 4141
  • [3] A novel optimal distribution system planning framework implementing distributed generation in a deregulated electricity market
    Porkar, S.
    Poure, P.
    Abbaspour-Tehrani-fard, A.
    Saadate, S.
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2010, 80 (07) : 828 - 837
  • [4] Distributed Generation Electricity Price Forecasting in a Deregulated Electricity Market
    Porkar, S.
    Poure, P.
    Saadate, S.
    [J]. INTERNATIONAL REVIEW OF ELECTRICAL ENGINEERING-IREE, 2012, 7 (05): : 5829 - 5839
  • [5] Multistage model for distribution expansion planning with distributed generation - Part II: Numerical results
    Haffner, Sergio
    Alves Pereira, Luis Fernando
    Pereira, Luis Alberto
    Barreto, Lucio Sangoi
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2008, 23 (02) : 924 - 929
  • [6] Multistage model for distribution expansion planning with distributed generation - Part I: Problem formulation
    Haffner, Sergio
    Pereira, Luis Fernando Alves
    Pereira, Luis Alberto
    Barreto, Lucio Sangio
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2008, 23 (02) : 915 - 923
  • [7] Coordinated generation and transmission expansion planning in deregulated electricity market considering wind farms
    Hemmati, Reza
    Hooshmand, Rahmat-Allah
    Khodabakhshian, Amin
    [J]. RENEWABLE ENERGY, 2016, 85 : 620 - 630
  • [8] Distributed generation planning in the deregulated electricity supply industry
    Kuri, B
    Li, F
    [J]. 2004 IEEE POWER ENGINEERING SOCIETY GENERAL MEETING, VOLS 1 AND 2, 2004, : 2085 - 2089
  • [9] Reliability constrained generation expansion planning with consideration of wind farms uncertainties in deregulated electricity market
    Hemmati, Reza
    Hooshmand, Rahmat-Allah
    Khodabakhshian, Amin
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2013, 76 : 517 - 526
  • [10] Congestion Management in Deregulated Electricity Market Using Distributed Generation
    Sarwar, Md
    Siddiqui, Anwar Shahzad
    [J]. 2015 ANNUAL IEEE INDIA CONFERENCE (INDICON), 2015,