Application of Submodeling Technique in Numerical Modeling of Mechanized Tunnel Excavation

被引:13
|
作者
Zhao, Chenyang [1 ]
Lavasan, Arash Alimardani [1 ]
Schanz, Tom [1 ]
机构
[1] Ruhr Univ Bochum, Dept Civil & Environm Engn, Univ Str 150, D-44780 Bochum, Germany
关键词
Submodeling; Tunneling simulation; Strain energy; Computational cost; PREDICTION; SIMULATION; EMBANKMENT; ANISOTROPY; STABILITY;
D O I
10.1007/s40999-018-0318-8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This research proposes a novel methodology of applying submodeling technique in the numerical simulation of mechanized tunnel excavation. A submodel is a smaller scale cut out of the full scale model (global model) in which the more in detail simulations along with higher degree of precision are conducted. Apparently, the submodel should include the near field around the TBM that is significantly affected by tunneling process and the region of interest such as ground surface where the model responses have to be surveyed. The appropriate size of the submodel is found by evaluation of the strain energy distribution in the domain while the energy gradient has to fulfill the predefined criterion. To analyze the submodel, the nodal displacements are derived from the global model and applied to the boundaries of the submodel. Using the proposed submodeling technique in the tunneling, the computational costs are reduced, while the submodel provides realistic prediction of the deformations in the system and lining forces. Finally, the proposed submodeling method is applied in both 2D and 3D tunneling simulations while two types of submodeling strategy (fixed submodel and moving submodel) are adopted for the 3D simulations. The results indicate that both approaches are adequate for predicting the lining forces and ground movements.
引用
收藏
页码:75 / 89
页数:15
相关论文
共 50 条
  • [1] Application of Submodeling Technique in Numerical Modeling of Mechanized Tunnel Excavation
    Chenyang Zhao
    Arash Alimardani Lavasan
    Tom Schanz
    International Journal of Civil Engineering, 2019, 17 : 75 - 89
  • [2] Three-Dimensional Modeling and Analysis of Mechanized Excavation for Tunnel Boring Machines
    Mohammadzadeh, Danial S.
    Karballaeezadeh, Nader
    Zahed, Amirhossein Sanaei
    Mosavi, Amir
    Imre, Felde
    ACTA POLYTECHNICA HUNGARICA, 2021, 18 (04) : 213 - 230
  • [3] WHAT LIES AHEAD FOR MECHANIZED TUNNEL EXCAVATION
    ROBBINS, RJ
    UNDERGROUND SPACE, 1985, 9 (2-3): : 93 - 96
  • [4] WHAT LIES AHEAD FOR MECHANIZED TUNNEL EXCAVATION?
    Robbins, Richard J.
    Underground Space, 1985, 9 (2-3): : 93 - 96
  • [5] Predicting the amount of face seepage during the excavation of the mechanized tunnel, using numerical and analytical methods
    Majid Omidi Arjenaki
    Modeling Earth Systems and Environment, 2022, 8 : 2889 - 2896
  • [7] Numerical Modeling of Stress Disturbance Characteristics during Tunnel Excavation
    Zhu, Zeqi
    Sheng, Qian
    Zhang, Yumin
    Liu, Shiwei
    ADVANCES IN MATERIALS SCIENCE AND ENGINEERING, 2020, 2020
  • [8] Numerical modeling of affection of foundation pit excavation on metro tunnel
    Ding, Jiangshu
    Xian, Yaoqiang
    Liu, Tianjun
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 2562 - +
  • [9] Numerical modeling for the stress displacement distribution of tunnel after excavation
    Li, Yong-suo
    Zhang, Ke-neng
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 4827 - 4830
  • [10] Numerical modeling of affection of foundation pit excavation on metro tunnel
    Wang, Wei-Dong
    Wu, Jiang-Bin
    Weng, Qi-Ping
    Yantu Lixue/Rock and Soil Mechanics, 2004, 25 (SUPPL. 2): : 251 - 255