The impact of short-term variability and uncertainty on long-term power planning

被引:17
|
作者
Bylling, Henrik C. [1 ]
Pineda, Salvador [2 ]
Boomsma, Trine K. [1 ]
机构
[1] Univ Copenhagen, Dept Math, Copenhagen, Denmark
[2] Univ Malaga, Dept Elect Engn, Malaga, Spain
关键词
Power planning problems; Investment; Variability; Uncertainty; Generation expansion; GENERATION CAPACITY EXPANSION; TRANSMISSION; SYSTEMS; INVESTMENT; FORECAST; FRAMEWORK; MODEL;
D O I
10.1007/s10479-018-3097-3
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Traditionally, long-term investment planning models have been the apparent tool to analyse future developments in the energy sector. With the increasing penetration of renewable energy sources, however, the modelling of short-term operational issues becomes increasingly important in two respects: first, in relation to variability and second, with respect to uncertainty. A model that includes both may easily become intractable, while the negligence of variability and uncertainty may result in sub-optimal and/or unrealistic decision-making. This paper investigates methods for aggregating data and reducing model size to obtain tractable yet close-to-optimal investment planning decisions. The aim is to investigate whether short-term variability or uncertainty is more important and under which circumstances. In particular, we consider a generation expansion problem and compare various representations of short-term variability and uncertainty of demand and renewable supply. The main results are derived from a case study on the Danish power system. Our analysis shows that the inclusion of representative days is crucial for the feasibility and quality of long-term power planning decisions. In fact, we observe that short-term uncertainty can be ignored if a sufficient number of representative days is included.
引用
收藏
页码:199 / 223
页数:25
相关论文
共 50 条
  • [1] The impact of short-term variability and uncertainty on long-term power planning
    Henrik C. Bylling
    Salvador Pineda
    Trine K. Boomsma
    [J]. Annals of Operations Research, 2020, 284 : 199 - 223
  • [2] Short-term decisions under long-term uncertainty
    Tol, RSJ
    [J]. ENERGY ECONOMICS, 1998, 20 (5-6) : 557 - 569
  • [3] SHORT-TERM AND LONG-TERM VARIABILITY OF SNOW ALBEDO
    WINTHER, JG
    [J]. NORDIC HYDROLOGY, 1993, 24 (2-3) : 199 - 212
  • [4] Short-term versus long-term lltary planning
    Bar -El, Ronen
    Kagan, Kobi
    Tishler, Asher
    [J]. ECONOMICS OF PEACE AND SECURITY JOURNAL, 2009, 4 (01): : 84 - +
  • [5] COORDINATION OF LONG-TERM AND SHORT-TERM GENERATION PLANNING IN THERMAL POWER-SYSTEMS
    HANDKE, J
    HANDSCHIN, E
    LINKE, K
    SANDERS, HH
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (02) : 803 - 809
  • [6] Comparison of short-term and long-term variability in nasalance scores
    Lewis, Kerry E.
    Watterson, Thomas
    Blanton, Ann
    [J]. CLEFT PALATE-CRANIOFACIAL JOURNAL, 2008, 45 (05): : 495 - 500
  • [7] Short-term and long-term variability of plasma homocysteine measurement
    Garg, UC
    Zheng, ZJ
    Folsom, AR
    Moyer, YS
    Tsai, MY
    McGovern, P
    Eckfeldt, JH
    [J]. CLINICAL CHEMISTRY, 1997, 43 (01) : 141 - 145
  • [8] Short-term aid has long-term impact
    Butler, Declan
    [J]. NATURE, 2015, 521 (7552) : 269 - 269
  • [9] THE RELATIONSHIP OF M AND FM TO LONG-TERM AND SHORT-TERM PLANNING
    WOLFSON, W
    KELLERMAN, H
    [J]. AMERICAN PSYCHOLOGIST, 1963, 18 (07) : 364 - 364
  • [10] PLANNING FOR LONG-TERM PROCESSES, NOT FOR SHORT-TERM BUDGET GOALS
    HOLLANDER, S
    [J]. NACHRICHTEN FUR DOKUMENTATION, 1995, 46 (02): : 79 - 82