Productivity Improvement Strategies Using Simulation in Offshore Plant Construction

被引:5
|
作者
Back, Myung Gi [1 ]
Woo, Jong Hun [2 ]
Lee, Philippe [3 ]
Shin, Jong Gye [4 ]
机构
[1] Seoul Natl Univ, Naval Architecture & Ocean Engn, Seoul, South Korea
[2] Korea Maritime & Ocean Univ, Naval Architecture & Ocean Syst Engn, Busan, South Korea
[3] Xinnos Co Ltd, PLM Res Lab, Seoul, South Korea
[4] Seoul Natl Univ, Res Inst Marine Syst Engn, Naval Architecture & Ocean Engn, Seoul, South Korea
来源
JOURNAL OF SHIP PRODUCTION AND DESIGN | 2017年 / 33卷 / 02期
基金
新加坡国家研究基金会;
关键词
modeling and simulation; digital shipbuilding system; shipbuilding; offshore plant production; process monitoring; EQUIPMENT; SYSTEM; DESIGN;
D O I
10.5957/JSPD.33.2.150016
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
Since the global financial crisis of 2008, the global shipbuilding industry has changed considerably and placed major Korean shipbuilding companies (mostly common carrier builders) in a precarious position. Current competitiveness in the global shipbuilding industry has been attracted by low labor costs in China. The Korean shipbuilding industry, with heavy industry as the central figure, is attempting to increase its share of offshore plant construction to develop deep-sea resources. This highlights the most outdated part of offshore plant in Korea, the development technology, which includes front-end engineering development and deep-water floaters, unlike in more advanced companies in the United States, where development technology has advanced rapidly. This has prompted the Korean government to invest most of its R&D funds in the areas of product and equipment development. However, mega shipbuilders such as Samsung, Hyundai, and Daewoo have incurred considerable losses at construction stages because of major delays in production. By contrast, international engineering companies have supported development engineering. The considerable financial losses incurred by mega shipbuilders are believed to be caused by a lack of quality management with respect to the massive production quantities and complexities involved in outfitting topside structures. This study investigates a strategy to advance production management specialized for the offshore plant business and describes a robust and sustainable technical roadmap based on current information technologies (IT) and simulation-based management methods.
引用
收藏
页码:144 / 155
页数:12
相关论文
共 50 条
  • [1] Bottleneck identification in a tyre manufacturing plant using simulation analysis and productivity improvement
    Krishnan, Srijit
    Dev, Sarang A.
    Suresh, Rahul
    Sumesh, A.
    Rameshkumar, K.
    [J]. MATERIALS TODAY-PROCEEDINGS, 2018, 5 (11) : 24720 - 24730
  • [2] Development of Augmented Reality System for Productivity Enhancement in Offshore Plant Construction
    Choi, Sungin
    Park, Jung-Seo
    [J]. JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2021, 9 (02) : 1 - 23
  • [3] CONSTRUCTION PRODUCTIVITY IMPROVEMENT
    CHOROMOKOS, J
    MCKEE, KE
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1981, 107 (01): : 35 - 47
  • [4] CONSTRUCTION PRODUCTIVITY IMPROVEMENT
    ARDITI, D
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1985, 111 (01): : 1 - 14
  • [5] Simulation modelling for productivity improvement of sorting process in a ceramic plant
    Kruethi, Nuntiya
    Chaijit, Seksan
    Permpoonsinsup, Wachirapond
    Thongkot, Dechathanat
    Ismail, A. H.
    Srinoi, Pramot
    [J]. 2019 17TH INTERNATIONAL CONFERENCE ON ICT AND KNOWLEDGE ENGINEERING (ICT&KE), 2019, : 176 - 179
  • [6] Productivity improvement using discrete events simulation
    Al Hazza, M. H. F.
    Elbishari, E. M. Y.
    Bin Ismail, M. Y.
    Adesta, E. Y. T.
    Rahman, Nur Salihah Binti Abdul
    [J]. INTERNATIONAL CONFERENCE ON ADVANCES IN MANUFACTURING AND MATERIALS ENGINEERING (ICAMME 2017), 2018, 290
  • [7] Productivity Improvement Strategies in Green Construction Project: Formulation of a Theoretical Framework
    Mahat, Noor Aisyah Asyikin
    Adnan, Hamimah
    Yusuwan, Norazian Mohamad
    Maisham, Mysarah
    [J]. 4TH INTERNATIONAL CONFERENCE ON RESEARCH METHODOLOGY FOR BUILT ENVIRONMENT AND ENGINEERING 2019, 2019, 385
  • [8] Streamlining the Construction Productivity Improvement Process with the Proposed Role of a Construction Productivity Improvement Officer
    Ranasinghe, Upul
    Ruwanpura, Janaka
    Liu, Xin
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2012, 138 (06): : 697 - 706
  • [9] Productivity improvement in the construction process
    Kenley, Russell
    [J]. CONSTRUCTION MANAGEMENT AND ECONOMICS, 2014, 32 (06) : 489 - 494
  • [10] CONSTRUCTION PRODUCTIVITY IMPROVEMENT.
    Arditi, David
    [J]. 1600, (111):