Development and application of a new ballast water system for immersed tunnel installation: A case study of the Yuliangzhou tunnel in Xiangyang, China

被引:6
|
作者
Zhou, Xingtao [1 ,3 ,4 ]
Sun, Xiaowei [2 ]
Jiao, Yu-yong [1 ]
Zeng, Bocun [2 ]
Tan, Fei [1 ]
Li, Tao [2 ]
Wei, Pengfei [4 ]
机构
[1] China Univ Geosci, Fac Engn, Wuhan 430074, Peoples R China
[2] CCCC Second Harbor Engn Co Ltd, Wuhan 430040, Peoples R China
[3] Hubei Univ Arts & Sci, Sch Civil Engn & Architecture, Xiangyang 441053, Peoples R China
[4] Hubei Geol Bur, Geol Brigade Hubei 8, Xiangyang 441002, Peoples R China
基金
中国国家自然科学基金;
关键词
Ballast water system; Flexible water-filled container; Immersed tunnel installation; Yuliangzhou Tunnel; ELEMENT; SETTLEMENTS; STABILITY; LONG;
D O I
10.1016/j.tust.2021.104261
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Ballast water systems are an indispensable part of the installation of immersed tunnels and are utilized to increase or reduce the total weight of immersed tunnel elements in the processes of floating transportation, mooring and sinking. Traditional ballast water systems generally utilize rigid tanks, which consist of retaining walls made of steel-wood parts, for water supply and discharge. However, there are many drawbacks to the traditional ballast water system based on rigid tanks. For example, the construction of rigid ballast tanks is a complex process that is not very efficient and but is very costly. In addition, the processes of installing and dismantling the steel panels of rigid ballast tanks involve substantial welding work and many fire operations, which result in a substantial amount of smoke and dust inside the tunnel elements, resulting in a construction environment that is harmful to human health. Based on the Yuliangzhou Immersed Tunnel, which extends across the Hanjiang River in Xiangyang, China, a new type of ballast water system with flexible water-filled containers was developed to address the abovementioned problems. The equivalent volume method was proposed to determine the geometric size of the flexible water-filled containers. Field stability tests of the flexible water-filled containers were conducted on a 4.8% slope. The experimental results showed that the designed flexible container could meet the actual water demand of tunnel element immersion, without sliding or rolling during water injection, and that the relationship between the water amount and water pressure was approximately parabolic. In view of the specific functions in different installation stages of tunnel elements, the equipment layout of the new type of ballast water system was determined. Based on the processes of tunnel element installation, water supply and discharge technologies were designed. This system has been successfully applied in the Yuliangzhou Immersed Tunnel project, which supports the use of these technologies in immersed tunnel construction.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Numerical simulation of damping effect of ballast water system on motion response of immersed tunnel element
    Wang, Sen
    Xu, Tiao-Jian
    Dong, Guo-Hai
    Wang, Tong-Yan
    OCEAN ENGINEERING, 2023, 281
  • [2] Waterproof performance and failure mechanism of GINA gasket subject to diverse joint deformations: A case study of the Yuliangzhou immersed tunnel
    Hu, Zhinan
    Sun, Yadong
    Jiang, Lian
    Mao, Hongtao
    Xu, Yu
    Luo, Yonghuan
    CASE STUDIES IN CONSTRUCTION MATERIALS, 2025, 22
  • [3] Evaluation model for immersed tunnel health state: A case study of Honggu Tunnel, Jiangxi Province, China
    Xu, Xiangchun
    Tong, Liyuan
    Liu, Songyu
    Li, Hongjiang
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 90 : 239 - 248
  • [4] Innovative design and construction of a closure joint for inland-river immersed tunnels via dry-land construction methods: A case study of the Yuliangzhou tunnel in China
    Zhou, Xingtao
    Zeng, Bocun
    Sun, Xiaowei
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 153
  • [5] A new approach to water head estimation based on water inflow into the tunnel (case study: Karaj water conveyance tunnel)
    Morsali, Massoud
    Nakhaei, Mohammad
    Rezaei, Mohsen
    Hassanpour, Jafar
    Nassery, Hamidreza
    QUARTERLY JOURNAL OF ENGINEERING GEOLOGY AND HYDROGEOLOGY, 2017, 50 (02) : 126 - 132
  • [6] Application of the comprehensive forecast system for water-bearing structures in a karst tunnel: a case study
    Bu, Lin
    Li, Shucai
    Shi, Shaoshuai
    Li, Lipin
    Zhao, Yong
    Zhou, Zongqing
    Nie, Lichao
    Sun, Huaifeng
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2019, 78 (01) : 357 - 373
  • [7] Application of the comprehensive forecast system for water-bearing structures in a karst tunnel: a case study
    Lin Bu
    Shucai Li
    Shaoshuai Shi
    Lipin Li
    Yong Zhao
    Zongqing Zhou
    Lichao Nie
    Huaifeng Sun
    Bulletin of Engineering Geology and the Environment, 2019, 78 : 357 - 373
  • [8] A hard rock tunnel case study: Characterization of the water-bearing fracture system for tunnel grouting
    Lisa, Hernqvist
    Christian, Butron
    Asa, Fransson
    Gunnar, Gustafson
    Johan, Funehag
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 30 : 132 - 144
  • [9] Development and application of model test system for water leakage disease in tunnel lining
    Gao Cheng-lu
    Li Shu-cai
    Lin Chun-jin
    Li Li-ping
    Zhou Zong-qing
    Liu Cong
    Sun Shang-qu
    ROCK AND SOIL MECHANICS, 2019, 40 (04) : 1614 - 1622
  • [10] Introducing a new criterion for tunnel crown settlement: a case study of Chehel-Chay water conveyance tunnel
    Khalili, Alireza
    Ahangari, Kaveh
    Ghaemi, Masoud
    Zarei, Hamed
    INTERNATIONAL JOURNAL OF GEOTECHNICAL ENGINEERING, 2018, 12 (03) : 217 - 227