Performance monitoring of a northern 3.2 KWp grid-connected photovoltaic system

被引:10
|
作者
Thevenard, D [1 ]
Dignard-Bailey, L [1 ]
Martel, S [1 ]
Turcotte, D [1 ]
机构
[1] Numer Log Inc, Waterloo, ON N2J 2M3, Canada
关键词
D O I
10.1109/PVSC.2000.916233
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper summarizes five years of monitoring of a facade-mounted grid-connected system in Canada's far North. The system has been in operation since July 1995 and has delivered around 2 MWh of electrical power on an annual basis since then. Climatic and solar radiation conditions at the site are reviewed, and the performance of the system is assessed from a component perspective (PV array, power conditioning unit) and from a global perspective (AC power delivered to the grid, system efficiency, system reliability).
引用
收藏
页码:1711 / 1714
页数:4
相关论文
共 50 条
  • [1] The Analysis Performance of a Grid-Connected 8.2 kWp Photovoltaic System in the Patagonia Region
    Vidal, Humberto
    Rivera, Marco
    Wheeler, Patrick
    Vicencio, Nicolas
    [J]. SUSTAINABILITY, 2020, 12 (21) : 1 - 16
  • [2] Performance Evaluation of 4 kWp grid-connected photovoltaic system in Casablanca, Morocco
    Karami, Elmehdi
    Rafi, Mohamed
    Ridah, Abderraouf
    [J]. JOURNAL OF ELECTRICAL SYSTEMS, 2021, 17 (03) : 363 - 375
  • [3] Performance Analyses of a 454 kWp Grid-Connected Rooftop Photovoltaic System in Southern Norway
    Tayyib, Muhammad
    Lie, Ellen K.
    [J]. 2020 47TH IEEE PHOTOVOLTAIC SPECIALISTS CONFERENCE (PVSC), 2020, : 1873 - 1877
  • [4] Modeling and Simulation of 100 kWp Grid-Connected Photovoltaic Power System
    Rawoof, Rafia
    Balasubramanian, R.
    Muthukrishnan, N. Moorthy
    [J]. 2015 CONFERENCE ON POWER, CONTROL, COMMUNICATION AND COMPUTATIONAL TECHNOLOGIES FOR SUSTAINABLE GROWTH (PCCCTSG), 2015, : 15 - 20
  • [5] Performance Monitoring and test System for Grid-Connected Photovoltaic Systems
    Zou, Xinjing
    Li Bian
    Zhai Yonghui
    Liu Haitao
    [J]. 2012 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2012,
  • [6] A Techno-Economic Optimization and Performance Assessment of a 10 kWP Photovoltaic Grid-Connected System
    Kebede, Abraham Alem
    Berecibar, Maitane
    Coosemans, Thierry
    Messagie, Maarten
    Jemal, Towfik
    Behabtu, Henok Ayele
    Van Mierlo, Joeri
    [J]. SUSTAINABILITY, 2020, 12 (18)
  • [7] Analytical performance monitoring of a 142.5 kWp grid-connected rooftop BIPV system in Singapore
    Wittkopf, Stephen
    Valliappan, Selvam
    Liu, Lingyun
    Ang, Kian Seng
    Cheng, Seng Chye Jonathan
    [J]. RENEWABLE ENERGY, 2012, 47 : 9 - 20
  • [8] Energy performance and loss analysis of 100 kWp grid-connected rooftop solar photovoltaic system
    KhareSaxena, Anupama
    Saxena, Seema
    Sudhakar, K.
    [J]. BUILDING SERVICES ENGINEERING RESEARCH & TECHNOLOGY, 2021, 42 (04): : 485 - 500
  • [9] Environmental impact of a 290.4 kWp grid-connected photovoltaic system in Kocaeli, Turkey
    C. Aksoy Tırmıkçı
    C. Yavuz
    [J]. Clean Technologies and Environmental Policy, 2020, 22 : 1943 - 1951
  • [10] Modeling of 1.6 kWp Single-Phase Grid-Connected Photovoltaic System
    Purwadi, Agus
    Rizqiawan, Arwindra
    Fachrizal, Reza
    Heryana, Nana
    [J]. 5TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING AND INFORMATICS 2015, 2015, : 552 - 557