Transient Analysis of a k-out-of-n:G System with N-Policy, Repairmen's Multiple Vacations, and Redundant Dependency

被引:2
|
作者
Wu, Wenqing [1 ,2 ]
Tang, Yinghui [1 ,2 ]
机构
[1] Sichuan Normal Univ, Visual Comp & Virtual Real Key Lab Sichuan Prov, Chengdu 610068, Sichuan, Peoples R China
[2] Sichuan Normal Univ, Sch Math & Software Sci, Chengdu 610068, Sichuan, Peoples R China
基金
中国国家自然科学基金;
关键词
RELIABILITY-ANALYSIS; OPTIMIZATION; AVAILABILITY; MODEL;
D O I
10.1155/2015/209653
中图分类号
O1 [数学];
学科分类号
0701 ; 070101 ;
摘要
This paper analyzes a k-out-of-n:G repairable system with N-policy, repairmen's multiple synchronous vacations, and redundant dependency. When there is no failed component in the system, the repairmen leave for a vacation, the duration of which follows a phase type distribution. Upon returning from vacation, they should take another vacation if there are less than.. failed components waiting in the system. This pattern continues until at least.. failed components are waiting. Moreover, the redundant dependency which is a special kind of failure dependency is taken into account in the multicomponent system. Under such assumptions, the availability, the rate of occurrence of failures, and the reliability of the system are derived in transient regime by applying the quasi-birth-and-death process. Furthermore, the Runge-Kutta method is carried out to numerically discuss the time-dependent behavior of the system reliability measures. Finally, a special case of the system is presented to show the validity of our model.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Reliability analysis for a k-out-of-n:G system with redundant dependency and repairmen having multiple vacations
    Yuan, Li
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (24) : 11959 - 11969
  • [2] COMPUTATION AND PROFIT ANALYSIS OF A k-OUT-OF-n:G REPAIRABLE SYSTEM UNDER N-POLICY WITH MULTIPLE VACATIONS AND ONE REPLACEABLE REPAIR FACILITY
    Wu, Wenqing
    Tang, Yinghui
    Yu, Miaomiao
    Jiang, Ying
    RAIRO-OPERATIONS RESEARCH, 2015, 49 (04) : 717 - 734
  • [3] Analysis of a repairable k-out-of-n:G system with repairman's multiple delayed vacations
    Wu, Wenqing
    Tang, Yinghui
    Yu, Miaomiao
    Jiang, Ying
    INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS, 2016, 93 (12) : 2141 - 2161
  • [4] Analysis of an k-out-of-n:G system with redundant dependency and repair equipment procurement
    Wu, Wenqing
    Zuo, Kai
    Tang, Yinghui
    Zhang, Yuanyuan
    JOURNAL OF CONTROL AND DECISION, 2021, 8 (04) : 403 - 414
  • [6] The k=n(G) repairable system with multiple synchronous vacations of c repairmen
    Tang, Ying-Hui
    Liang, Xiao-Jun
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2013, 33 (09): : 2330 - 2338
  • [7] Reliability analysis for the consecutive-k-out-of-n: F system with repairmen taking multiple vacations
    Yuan, Li
    Cui, Zhen-Dong
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (07) : 4685 - 4697
  • [8] Analysis of a multi-component system with failure dependency, N-policy and vacations
    He, Gang
    Wu, Wenqing
    Zhang, Yuanyuan
    OPERATIONS RESEARCH PERSPECTIVES, 2018, 5 : 191 - 198
  • [9] Vacation Policy for k-out-of-n Redundant System with Reboot Delay
    Tyagi, Vaishali
    Ram, Mangey
    Manglik, Monika
    Arora, Ritu
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2024, 9 (02) : 366 - 384
  • [10] ANALYSIS OF THE M(X)/G/1 QUEUE WITH N-POLICY AND MULTIPLE VACATIONS
    LEE, HW
    LEE, SS
    PARK, JO
    CHAE, KC
    JOURNAL OF APPLIED PROBABILITY, 1994, 31 (02) : 476 - 496