SCHEDULING FAMILY JOBS ON AN UNBOUNDED PARALLEL-BATCH MACHINE TO MINIMIZE MAKESPAN AND MAXIMUM FLOW TIME

被引:0
|
作者
Geng, Zhichao [1 ]
Yuan, Jinjiang [1 ]
机构
[1] Zhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Henan, Peoples R China
关键词
Parallel-batch; family jobs; maximum flow time; pareto optimization; TOTAL COMPLETION-TIME; RELEASE DATES; SETUP TIME; SINGLE; DETERIORATION; ALGORITHMS; LATENESS; NUMBER;
D O I
10.3934/jimo.2018017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper investigates the scheduling of family jobs with release dates on an unbounded parallel-batch machine. The involved objective functions are makespan and maximum flow time. It was reported in the literature that the single-criterion problem for minimizing makespan is strongly NP-hard when the number of families is arbitrary, and is polynomially solvable when the number of families is fixed. We first show in this paper that the single-criterion problem for minimizing maximum flow time is also strongly NP-hard when the number of families is arbitrary. We further show that the Pareto optimization problem (also called bicriteria problem) for minimizing makespan and maximum flow time is polynomially solvable when the number of families is fixed, by enumerating all Pareto optimal points in polynomial time. This implies that the single-criterion problem for minimizing maximum flow time is also polynomially solvable when the number of families is fixed.
引用
收藏
页码:1479 / 1500
页数:22
相关论文
共 50 条
  • [1] Online scheduling on an unbounded parallel-batch machine and a standard machine to minimize makespan
    Fu, Ruyan
    Tian, Ji
    Yuan, Jinjiang
    Li, Ya
    [J]. INFORMATION PROCESSING LETTERS, 2014, 114 (04) : 179 - 184
  • [2] Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
    Yuan Gao
    Jinjiang Yuan
    C. T. Ng
    T. C. E. Cheng
    [J]. 4OR, 2022, 20 : 273 - 287
  • [3] Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost
    Gao, Yuan
    Yuan, Jinjiang
    Ng, C. T.
    Cheng, T. C. E.
    [J]. 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2022, 20 (02): : 273 - 287
  • [4] Online scheduling on unbounded parallel-batch machines to minimize the makespan
    Tian, Ji
    Cheng, T. C. E.
    Ng, C. T.
    Yuan, Jinjiang
    [J]. INFORMATION PROCESSING LETTERS, 2009, 109 (21-22) : 1211 - 1215
  • [5] Bicriteria scheduling on an unbounded parallel-batch machine for minimizing makespan and maximum cost
    Li, Shuguang
    Geng, Zhichao
    [J]. INFORMATION PROCESSING LETTERS, 2023, 180
  • [6] Online scheduling on unbounded parallel-batch machines to minimize maximum flow-time
    Li, Wenhua
    Yuan, Jinjiang
    [J]. INFORMATION PROCESSING LETTERS, 2011, 111 (18) : 907 - 911
  • [7] Parallel-batch scheduling of deteriorating jobs with release dates to minimize the makespan
    Li, Shisheng
    Ng, C. T.
    Cheng, T. C. E.
    Yuan, Jinjiang
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 210 (03) : 482 - 488
  • [8] The unbounded single machine parallel batch scheduling problem with family jobs and release dates to minimize makespan
    Yuan, JJ
    Liu, ZH
    Ng, CT
    Cheng, TCE
    [J]. THEORETICAL COMPUTER SCIENCE, 2004, 320 (2-3) : 199 - 212
  • [9] Online Scheduling on Two Uniform Unbounded Parallel-Batch Machines to Minimize Makespan
    Yuan, Jin-Jiang
    Ren, Li-Li
    Tian, Ji
    Fu, Ru-Yan
    [J]. JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF CHINA, 2019, 7 (02) : 303 - 319
  • [10] A best online algorithm for unbounded parallel-batch scheduling with restarts to minimize makespan
    Jinjiang Yuan
    Ruyan Fu
    C. T. Ng
    T. C. E. Cheng
    [J]. Journal of Scheduling, 2011, 14 : 361 - 369