共 50 条
- [2] Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost [J]. 4OR, 2022, 20 : 273 - 287
- [3] Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost [J]. 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2022, 20 (02): : 273 - 287
- [10] A best online algorithm for unbounded parallel-batch scheduling with restarts to minimize makespan [J]. Journal of Scheduling, 2011, 14 : 361 - 369